Loading...
HomeMy WebLinkAboutResolution #4066 RESOLUTION NO 4066 A RESOLUTION APPROVING AN AGREEMENT BETWEEN MAURER-STUTZ, (PROJECT ENGINEER), DIXON ENGINEERING, INC (DIXON), AND THE CITY OF CANTON AND DIRECTING THE MAYOR TO EXECUTE AND DELIVER SAID AGREEMENT ON BEHALF OF THE CITY OF CANTON,ILLINOIS. WHEREAS, the Finance Committee of the City of Canton has determined that it is necessary and in the best interests of the City of Canton to enter into a Agreement with Maurer-Stutz and Dixon Engineering, Inc. as set forth in Exhibit"A"attached hereto and incorporated herein; and WHEREAS,the City Council of the City of Canton has made a similar determination. NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND CITY COUNCIL OF THE CITY OF CANTON,ILLINOIS,AS FOLLOWS: 1. That the Agreement attached hereto and incorporated herein as Exhibit"A" is hereby approved by the Canton City Council. 2. That the Mayor of the City of Canton, Illinois is hereby authorized and directed to execute said Agreement on behalf of the City of Canton. 3. That this Resolution shall be in full force and effect immediately upon its passage by the City Council of the City of Canton, Illinois and approval by the Mayor thereof. PASSED by the City Council of the City of Canton, Illinois at a regular meeting this 20`h day of May, 2014 upon a roll call vote as follows: AYES: Aldermen Ellis, Justin Nelson, West, Pickel,Jim Nelson NAYS: None ABSENT: Aldermen Lovell, Pasley ABSTAIN: Aldermen Tad Putrich APPROVED: Je fr : Fri , ayor ATT T: eae.K„ Dian vley- ck, City Cler NLR Resolutions 5/19/14 D'�O� 417 East IL. Route 173 Suite 106-Box 102 Antioch, IL 60002 ENGINEERING 8� INSPECTION SERVICES Telephone: (630)553-7750 FOR THE COATING INDUSTRY PROPOSAL AND CONTRACT AGREEMENT Legged, (Pine Street Tank), #13-29-02-02 1.,,��7 4�i �G,.�w� �C��i���J�fYtti^/ This Agreement between ' (P.�ej�cct-€�ig�erar) and Dixon Engineering, Inc. (DIXON) for technical inspection services on the leg�ed water storage tank(Project) located at Canton.Illinois (Owner) is as follows: Owner The Rtef�ee�agrees to engage DIXON for Consultin�and Insaection services hereinafter set forth. A. DIXON agrees to perform the Prenaration of Technical Snecifications and Contract Documents, Proiect Administration, Pre-Construction Meeting, Weld Insnection,and Paint Insnection Services as detailed in the attached SCHEDULE A. �wn�, B. ���gi�aer agrees to pay DIXON as compensation for his services, not to exceed the sum of Twentv Two Thousaad.Four Hundred, and Sixteen dollars and Twentvi cents ($22,416.20). Terms of service fee and payment shall be detailed in SCHEDULE B. Prices quoted in contract are subject to change ninety (90)days after proposal date. dwntr C. If additional services are requested by the Rr�s�-�g�ee�which are not within the proposed scope of the services defined in SCHEDULE A, then these services will be charged per attached SCHEDLILE C, plus reimbursable expenses. Ow.,tr D. The P.�e}�c���and DIXON agree to the conditions as set forth in the attached General Provisions of the A�reement. The kr�����ee�r shall be responsible for all provisions which refer to the Owner. Qw�- This contract format shall include this cover sheet, Schedules A, B, C, and General Provisions. If this proposal/contract is for more than one service, multiple Schedules A and B may be used. Any changes in this proposal/contract should be addressed by a separate addendum. Brad Schotanus, Project Manager January 28, 2014 PROPOSED by DIXON(Not a contract until approved by an officer) PROPOSAL DATE S �.J��"_"s�' ' !/l�y�' C/�r ..,c;���/! CO�1�CT A VED by R POS TION DATE �Y e� Ow nrr� CO SIGNATURE(if required) POSITION DATE CONTRACT APPROVED by DIXON OFFICER POSITION EFFECTIVE CONTRACT DATE Members: Society of Protective Coatings•American Water Works Association Consulting Engineers Council Page 1 of 8 SCHEDULE A Legged, (Pine Street Tank), #13-29-02-02 C�nton,Il[inois I. Technical Specifications & Contract Documents A. Owner agrees: 1. Use, unaltered,the Contract Documents provided by Dixon when entering into an agreement with the Contractor. Dixon will not unreasonably withhold a request to alter the document. This clause is essential to protect Dixon's interest in regards to Contractor pays for default clauses. This provision in no way creates any contractual obligation, including those of third party ber�eficiary status, or relationship between DIXON and Contractor. 2. Pay all advertising costs. 'The method of advertising is to be determined by the Owner. 3. Provide a place for the bid opening. 4. Open the bids received. 5. Review Payment and Performance Bonds, and insurance certificates of selected Contractor. These should be reviewed by the Owner's insurance consultant and attorney. 6. Sign and forward to the Contractor the notice to proceed. This Notice to Proceed will be supplied to Owner by Dixon. B. DIXON agrees: l. Preparation of Technical Specifications and Contract Documents: a. Prepare Technical Specifications and Contract Documents for project to include, but not limited to, the following: 1) Advertisement for Bids 2) Information for Bidders 3) General Conditions 4) Detailed specifications 5) Inspection Form 6) Bid/Agreement Form b. Address all questions, written or verbal response, concerning the project that are submitted to DIXON. (Dixon will not be held to any non-written statement.) c. Direct mail advertisements to Contractors who have been prior approved as capable and conscientious by DIXON. d. Send specifications to selected, appropriate Builders Exchanges and Dodge Reports. e. Review the bids submitted to the Owner and recommend award based on lowest responsible and responsive bidder. f. Furnish Owner and Contractor the Contract Documents to complete. Page 2 of 8 g. Furnish Owner with complete Notice to Proceed to sign and forward to the Contractor. II. Project Administration: 1. Project administration for the purpose of coordinating the inspection program, local inspector assistance, secretarial services, shop drawing review, and project finalization. 2. Review Cantractor's Schedule of Values and work schedule. 3. Review shop drawings for compliance with technical specifications. 4. DIXON shall record a written record of all Project meetings with the Owner. Meeting minutes shal l be submitted to the Owner not more than ten (10) days after the meeting. 5. Perform services expected of Engineer and detailed in the EJCDC General Conditions. III. Pre-construction Meeting: 1. Attend a pre-construction meeting, and distribute minutes to major participants. Topics of discussion will include Contractor's: a. emergency response plan, b. responsibilities to the Owner, c. responsibilities to her/his workers, d. responsibilities to the public e. inspection start time f. inspection schedule g. liquidated damages h. Contractor's site specific Lead, Health, and Safety Plan i. Wha Contractor's desi�nated OSHA competent person for lead, health and safety plan for notification and protection of the public 2. Contractor will have submittals which are to be submitted ten(10) days prior to the pre- construction meeting. Some of these include: Contractor's schedule, ventilation, fall prevention, canfined space, waste hauler certifications, welder certifications, etc. These will be reviewed prior to meeting and only deficiencies discussed. IV. Critical Phase Inspectioas: A. Weld Inspection: 1. One(1) visit(s)to inspect repair/instal lation wark for specification compliance. All weld repairs will be visually inspected for surface defects (i.e. undercut, negative reinforcement, non-fusion, etc.). V. Inspection Services: 1. Review Contractor's crew size and equipmcnt for ability to meet specification requirements and time constraints. 2. Review abrasive and coating materials for approved manufacturers. 3. Inspect compressed air at blast nozzle for cleanliness (i.e. oil, moisture). 4. Measure surface profile created by abrasive blast cleaning by compressive tape or surface comparator. Page 3 of 8 5. Inspect abrasive blast cleanliness for specification requirements using SSPC Visual Standards, latest edition thereof. 6. Review coating mixing,thinning, and manufacturer's application requirements. 7. Monitor environmental conditions prior to and during coating application(i.e. ambient temperature, surface temperature, relative humidity, and dew point). 8. Inspect applied coating for dry film thickness, coverage, uniformity, and cure. 9. Collect appropriate samples for pre-disposal laboratory testing. 10. Prepare daily inspection report detailing above mentioned items and daily progress. Page 4 of 8 SCHEDULE B Legged, (Pine Street Tank), #13-29-02-02 Canton,Illinois 1. Payment for Scope of Services, Schedule A—Technical Specifications & Contract Documents, is the lump sum fee of$3,500.00. 2. Compensation for Schedule A—Project Administration, shall be the time and material fee of $650.00. Payment due as project progresses. 3. Compensation for participation at the pre-construction meeting shall be the lump sum fee of $675.00, and will include preparation and travel time. 4. Compensation for weld inspection, Schedule A—Critical Phase Inspections is$675.00 based on a$675.00 per visit fee with one�visit(s)recommended. 5. Compensation for surface preparation, coating inspection services, secretarial services, and project management as outlined in Schedule A—Inspection Services is $16916.20. DIXON reserves the right to send the level of inspector they feel necessary based on the Contractor, project scope, and project progress. All fees are time and material per Schedule C. DIXON will notify the Owner every two (2) weeks regarding the estimated budget available, and will advise if a change in fees or change in Scope of Services is necessary. This fee and Scope of Services are negotiable between DIXON and the Owner. Inspection: Mobilization: Inspection time 8 hrs.@$75.00/hr. _ $600.00 Travel time 3 hrs.(c�,$75.00/hr. _ $225.00 Secretarial 0.5 hr.@$50.00/hr. = 25.00 Mileage 163 miles @$0.60/mile = 97.80 Per Diem @$125.00 = 125.00 Total(1 way) _ $322.80 Contract Administration 0.25 hr.@$125.00/hr. = 31.25 Total Estimated Daily Fee = $781.25 Total Round trip = $645.60 x 2 trips Total Estimate Daily Fee $781.25 Total Mobilization Costs $1,291.20 x 20 days Total Fee $15,625.00 plus mobilization @$1,291.20=$16,916.20 6. DIXON reserves the right to adjust individual inspection line items as necessary based on the Contractor's performance and pace of work. The total fees for Schedule B will not be exceeded without prior approval from the Owner. 7. Invoices will be compiled after the 20�h of the month and shall include from the 20�'of the preceding month to the 20`h of the invoiced month. Bimonthly invoicing will be completed on larger projects, or at the Owner's request. 8. All DIXON service invoices which are paid within ten (10) days of date of issue shall be discounted (Owner's favor) one percent(1%). 9. All DIXON service invoices which are outstanding more than sixty(60) days from date of issue shall be assessed(DIXON's favor)one and one half percent(1'/z%) per month interest from date thirty (30)days after date of issue. Page 5 of 8 10. Delay in completing the work which is the responsibility of the Owner and which extends the amount of time required for DIXON to complete their work shall be considered an additional service, and DIXON shall be compensated for this delay under the provisions of Schedule C of the Agreement. 1 l. Failure by the Contractor to notify DIXON of the necessity to change inspection dates more than twenty-four(24)hours in advance and which results in unnecessaxy travel and/or expense to DIXON shall cause this travel and expense to be considered an additional service, and DIXON shall be compensated for travel and/or expense under the provisions of Schedule C of the Agreement. 12. Requests for attending council meetings shall be forthcoming from the Owner in writing unless other arrangements are made between the Owner and DIXON. Attendance of council meetings shall be considered an additional service and DIXON shall be compensated under the provisions of Schedule C of the Agreement. Page 6 of 8 SCHEDULE C Engineering Services Fees Labor Class Per Hour *Overtime Rate Principal................................................................................ $175.00 Expert Witness (Office, Travel & Court)...................... $185.00 Project Manager................................................... $125.00 Registered Professional Engineer............................... $]25.00 Certified NACE Inspector....................................... $100.00 Assistant Project Manager....................................... $100.00 Staff Engineer—Level III........................................ $75.00 to $85.00 Staff Engineer—Level II......................................... $70.00 to $80.00 Staff Engineer—Level I.......................................... $65.00 to $75.00 CAD Supervisor................................................... $65.00 to $75.00 CAWI or CWI Welding Inspector.............................. $100.00 to $110.00 Inspector—Level III.............................................. $70.00 to $80.00 Inspector—Level II............................................... $65.00 to $75.00 Inspector—Level I................................................ $60.00 to $70.00 CAD "I'echnician................................................... $60.00 to $70.00 Secretarial Services............................................... $50.00 & expenses Bookkeeping Services............................................ $45.00 Project Status Meetings w/Project Engineers and Council or Board Meetings................................................... Time and Expenses, Including Preparation Time *All Saturday, Sunday, and holiday inspections are overtime rate. Overtime rate is l '/� time the hourly rate. Overtime rate does not apply to Principal. Expenses: Metropolitan Non—Metropolitan Mileage............................................................ $0.70/mile ��n�iUd�ng cous� $0.60/mile Meals& Lodging. ................................................ $145 per diem $125 per diem (�7�av be increased based on location) Without Lodging................................................. $35%day $30/day Air Travel......................................................... Business fare from Grand Rapids, Chicago O'Hare, or Milwaukee, plus full size car rental Material (gaskets, cathodic protection caps, etc.)............ Negotiated FEES EFF ECTIVE THROUGH JUNE 30,2014 Revised 07/13 Page 7 of 8 GENERAL PROVISIONS—PROJECT ENGINEER: Project Engineer shall provide all criteria and full infonnation as Project Engineer's requirements for the project;dcsignate a person to act with authority on Project Gngineer's behalf in respect to all aspects of the Project;examine and respond promptly to DIXON's submissions;and give prompt written notice to DIXON whenever he abserves or othenvise becomes aware of any defect in the work or breach of Contract or portions conducted by DIXON or any Contractor. Project Engineer shall also do the following and pay all costs incident thereto: - Guarantee access to and make all provisions for DIXON to enter upon public and private propeRy. - Provide such legal,accounting,independent cost estimates and insurance counseling services as may be required for the Project,and any auditing services required in respect of Contractor(s)applications for payment,and any inspection services to detemiine if Contractor(s)is performing the work legally. - Provide field control surveys and fix reference points and base lines as determined necessary for good control during construction. - Furnish approvals and permits for all govemmental authorities havingjurisdiction over thc Project. DIXON will not be responsible nor will they pay any costs incurced in advertising or procuring bids or proposals from Contractur(s)on behalf of the Project Engineer or the OWNER. DIXON SERV[CE FEES(Schedule C)used as a basis for compensation for additional and/or basic services includes all salaries and waDes(basic and incentive)paid to all personnel engaged directly on the Project inc(uding but not limited tq engineers,technica]personnel,typists and clerks. The fee schedule also includes all fringe benefits,indirect payroll expenses,corporate overhead ratio and profit ration. Reimbursable Expenses mean expenses incurred directly or indirecdy in connection with the for: transportation and subsistence incidental thereto; obtaining bids or proposals from Contractor(s);fumish and maintain field o�ce facilities;subsistence and transponation of Resident Project Representatives and their assistants;toll telephone calls and facsimile transmissiun;reproduction of Reports,Drawings,Specifications,and similar Project related items in addition to those required under Section A;expenses of photographic produetion techniques;and,if authorized in advance by Project Engineer,overtime work requiring higher[han regular rates. Reuse of Documents: All documents including Drawings and Specifications prepared by DIXON pursuant to this Contract aze instruments of service in respect of the Project. They are not intended ar represented to be suitable for reuse by Project Engineer or others on extensions of the Project or on any other Project. Any reuse without written verification or adaptation by DIXON for the specific purposes intended will be at Project Engineer's sole risk a�id wiU�uul liability or legal exposure to DIXON;and Project Engineer shall indemnify and hold harmless D[XON from all claims,damages,losses and expenses including attorney's fees arising out of or resulting therefrom. Any such verification or adaptation will entitle DIXON to further compensation at rates to bc agreed upon by Project Engineer and DIXON. The services to be performed by DIXON under this agreement are intended solely for[he benefit ofthe Project Engineer and OWNER. Nothing contained herein shall confer any rights upon or create any duties on the part of DIXON toward any person or persons not a party to this agreement. Including,but not limited to,any contractors,subcontractors,or suppliers,or the agents,officers,employees,insurers or sureties of any of them. Termination: The vbligation to provide further services under[his Contract may be terminated by either party upon seven days written notice in the event nf substantial failure by the other party to perform in accorda�tce with the terms hcreof through no fault of the terminxting party. In the event of any temiination,DIXON will be paid for all services rendered to the date of termination,all reimbursable expenses,termination expenses and anticipated profits if termination is without fault of D(XON. Project Engineer and DIXON each binds himself and his legal partners,successors,executors,administrators,assigns and legal representatives to the other party of this Contract and to the partners,successors,executors,administrators,assigns,and legal representatives of such other party,in respect to all covenants,agreemenu and obligations of this Contract. Neither Project Engineer nor DIXON shnll assign,sublet or transfer any rights under or interest in(including but without limitation,moneys that may become due or moneys that are due)this Contract without the written consent of the other,except as stated and except to the extent that the effect of this limitation may be restricted by law. Unless specifically stated to the contrary in any written consent to an assignment,no assignment will release or discharge the assignor from any duty or responsibility under this Contract. Nothing contained in this paragraph shall prevent DIXON fiom employing such independent consultants,associates and subcontractors as he may deem appropriate to assist him in perfom�ance of services hereunder. Nothing herein shall be construed to give any rights or benefits hereunder to anyone other than Project Engineer and D1XON. Dispute Resolution: All claims,counterclaims,disputes and other matters in question between the parties hereto azising out of or relating to this Agrcement or the breach thereof will be decided through non-binding mediation by mutually agreeable partics of expeRs or lawyers. lf inediation fails, the dispute shall be resolved in the local couR of law foUowing the laws of the State of Illinois. Page 8 of 8 iI D'�O� 417 East IL.Route 173 Suite 106-Box 102 Antioch, IL 60002 ENGINEERING 8� INSPECTION SERVICES Telephone:(630)553-7750 FOR THE COATING INDUSTRY PROPOSAL AND CONTRACT AGREEMENT Legged, (Pine Street Tnnk), #13-29-OZ-02 G:�,�o.0 '�.,,.��.. CC�;s.��„u,.�,r,--� This Agreement between ' (R�e}e�ar)and Dixan Engineering, Inc.(DIXON)for technical inspection services on the leEged water storage tank(Project)located at Canton.Illinois(Owner)is as follows: �wner The�est��agrees to engage DIXON for Consultine and Insaecfion services hereinafter set forth. A. DIXON agrees to perform the Preparation of Technical Snecifications and Contract Documents.Proiect Administration.Pre-Constraction Meetins.Weld�nsnection, and Paint Inspection Services as detailed in the attached SCHEDULE A. QWnr, B. �xa}eci-F�g�eer agrees to pay DIXON as compensation for his services,not to exceed the sum of Twentv Two Thousand,Four Hundred,aud Sigteen dollars.and Twentvi cents ($22 4• 16•20). Terms of service fee and payment shall be c3etailed in SCHEDULE B. Prices quoted in contract are subject to change nincty(90)days after proposal date. �w.sc•- C. If additional services are requested by the R�e}�ee�which are not within the proposed scope of the services defined in SCHEDULE A,then these services will be charged per attached SCHEDULE C,plus reimbursable expenses. 4ur�'r` D. The Pxejgs���and DIXON agree to the canditions as set forth in the attached General Provisions of the Agreement. The P�•^�°^�:-��=eer shall be responsible for all provisions which refer to the Owner. Qw�rr This contract format shall include this cover sheet, Schedules A,B,C,and General Provisions. If this proposal/contract is for more than one service,multiple Schedules A and B may be used. Any changes in this proposal/contract should be addressed by a separate addendum. Brad Schotanus,Project Manager January 28,2014 PROPOSED by DIXON(Not a convect until approved by an officer) PROPOSAL DATE � (..�o'���/'%r�'-� �.�,e.^T'�' C!•aL��'71��e� CON�{t�CT A VED by �Y Q�Law�a.�Uw►+er� POS fON DATE CO SIGNATURE(if required) POSITION DATE 8,,�,e/ S�� rr. D,d�f,o,� ,��. s/.�8/�Y CONTRACT APPROVED by DIXON OFFICER POSITION EFFECTIV CO TRACT DATE Members: Society of Protective Coatings•American Water Works Association Consulting Engineers Council Page 1 of 8