Loading...
HomeMy WebLinkAboutResolution #3479 RESOLUTION NO. 3479 A RESOLUTION APPROVING A LETTER OF AGREEMENT BETWEEN THE CITY OF CANTON AND MAURER STUTZ, INC., FOR SERVICES RELATED TO THE STANDPIPE REPAIRS WHEREAS, the City Council of the City of Canton, Illinois has reviewed the terms of said Agreement, a copy of which is attached hereto and made a part hereof as Exhibit A; and, WHEREAS, the City Council of the City of Canton, Illinois has determined that it is in the best interest of the City of Canton to approve said Agreement. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF CANTON, Fulton County, Illinois as follows: 1. That the corporate officers be and they are hereby authorized to enter into a written Agreement, copy attached as Exhibit A, with Maurer Stutz, Inc. for services related to the standpipe repairs. 2. That this Resolution shall be in full force and effect immediately upon its passage by the City Council of the City of Canton, Fulton County, Illinois and approval by the Mayor thereof. PASSED by the City Council of the City of Canton, Fulton County, Illinois, at a regular meeting this 20th day of July, 1999, upon a roll call vote as follows: AYES: Aldermen May, Shores, Meade, Nidiffer, Phillips, Sarff, Molleck, Hartford. NAYS: None. ABSENT: None . AP ROVED: Donald E. Edwards, Mayor Attest: Nancy Whites- City Clerk. MAURER. STUTZ, INC. „ ENGINEERS SURVEYORS 6 East Elm Street TEL 309-647-7831 Canton, Illinois 61520 FAX 309-647-6155 WORK ORDER TO: City of Canton 210 E. Chestnut Street Canton, IL 61520 FROM: Colin J. Edwards, P.E. DATE: July 16, 1999 The Undersigned orders Maurer-Stutz, Inc., Professional Engineer's and Professional Land Surveyors of the State of Illinois, to perform the following services related to the Standpipe Repairs in the City of Canton: - Prepare contract documents suitable for bidding; bidding and letting assistance including attendance at pre-bid meeting and evaluation of bids; field evaluation of anchor bolts and overflow pilaster condition, evaluation of pay requests, and coordination between the contractor and the City as may be required. Note that this work does not include any time in the event total repainting of the standpipe or tower is required. When such services have been performed, the undersigned agrees to pay the estimated cost of approximately $7,500.00 which is based on actual time expended at the rates shown on the attached schedule. Billing will be monthly. We would expect our services to begin immediately and be completed by December 15, 1999. Accepted, City of Canton: ~'~~ ~ 'r ~ / 9 9 Donald E. Edwards, Mayor Date attachment Sign, Date & Return to Us ~~~ PEORIA ~ CANTON MAURER. STUTZ, INC. „ ENGINEERS SURVEYORS 6 East Elm Street TEL 309-647-7831 Canton, Illinois 61520 FAX 309-647-6155 WORK ORDER TO: City of Canton 210 E. Chestnut Street Canton, IL 61520 FROM: Colin J. Edwards, P.E. DATE: July 16, 1999 The Undersigned orders Maurer-Stutz, Inc., Professional Engineer's and Professional Land Surveyors of the State of Illinois, to perform the following services related to the Standpipe Repairs in the City of Canton: - Prepare contract documents suitable for bidding; bidding and letting assistance including attendance at pre-bid meeting and evaluation of bids; field evaluation of anchor bolts and overflow pilaster condition, evaluation of pay requests, and coordination between the contractor and the City as may be required. Note that this work does not include any time in the event total repainting of the standpipe or tower is required. When such services have been performed, the undersigned agrees to pay the estimated cost of approximately $7,500.00 which is based on actual time expended at the rates shown on the attached schedule. Billing will be monthly. We would expect our services to begin immediately and be completed by December 15, 1999. Accepted, City of Canton: Donald E. Edwards, Mayor Date attachment Sign, Date ~ Return to Us PEORIA ~ CANTON MAURER-STUTI, INC. NOU6LYRQTESCHEDULE ROD/CHAIN PERSON ................................................. 535.00 INSTRUMENT PERSON ................................................. 40.00 PARTY CHIEF ......................................................... 45.00 PROFESSIONAL LAND SURVEYOR I ...................................... 65.00 PROFESSIONAL LAND SURVEYOR II ...................................... 94.00 FOUR MEMBER SURVEY CREW ......................................... 150.00 THREE MEMBER SURVEY CREW ........................................ 130.00 TWO MEMBER SURVEY CREW .......................................... 100.00 ONE MEMBER SURVEY CREW ........................................... 60.00 TECHNICIAN I ......................................................... 40.00 TECHNICIAN II ......................................................... 45.00 SENIOR TECHNICIAN ................................................... 50.00 TECHNOLOGIST ....................................................... 53.00 DESIGNER ............................. ............................. 56.00 ENGINEER I ........................................................... 50.00 ENGINEER II .......................................................... 55.00 PROFESSIONAL ENGINEER I ........................................... 60.00 PROFESSIONAL ENGINEER il ............................................ 75.00 PROFESSIONAL ENGINEER Ili ............................................ Q0.00 PROFESSIONAL ENGINEER IV .......................................... 94.00 STRUCTURAL ENGINEER I .............................................. 65.00 STRUCTURAL ENGINEER I( ............................................. 80.00 STRUCTURAL ENGINEER III ............................................. 98.00 CITY ENGINEER STANDARD RATE ........................................ 60.00 EXPERT WITNESS STANDARD RATE ..................................... 105.00 CLERICAL ............................................................ 28.00 Effective Date: 10/01/98