Loading...
HomeMy WebLinkAboutResolution #3930 - IDOTIllinois Department ~~ ?~4~ 3 ~ Municipal Estimate of of Transportation Maintenance Costs Section Number 10 - 00000 - 00 - GM Period from 01/01/2010 to 12/31/2010 Municipality City of Canton Estimated Cost of Maintenance Operations Maintenance For Grou III or III Material E ui ment or Labor Operation (No. -Description) Group ci,ii,iii,iv) Item Unit Quantit Unit Price Cost Operation Cost Contract Maintenance 1. HMA Overla IV HMA Surt Rem -Butt Jt S.Y. 346 17.00 $5,882.00 3,169 SY Bit Mat'Is Prime Coat Gal 205 3.00 $ 615.00 Non MFT HMA Surf Cse, Mix D, N50 Ton 355 125.00 $44,375.00 50,872.00 2. Mill &HMA Overla IV HMA Surf Rem, 1 1/2" S.Y. 16,865 5.00 $84,325.00 16,865 SY Bit Mat'Is Prime Coat Gal 1,687 3.00 $5,061.00 Area Reflect Crack Cont Treat, S s A S.Y. 16,865 3.00 $50,595.00 HMA Surf Cse, Mix D, N50 Ton 1,417 125.00 $177,125.00 Th I Pav't Mk -Line 4" Foot 2210 1.50 $3,315.00 Th I Pav't Mk -Line 24" Foot 51 10.00 $ 510.00 320,931.00 3. Testin Services ! Plant Ins ection L.S. 1 1,200.00 $1,200.00 1,200.00 durin Street Maint Prelimina En ineerin Base Fee $1,000.00 IV $320,931 5% $46;60 a s TOTAL $'I~ n ss Total Da Labor Costs $322,131.00 Total Estimated Maintenance Operation Cost $322,131.00 Preliminary Engineering 1 , Engineering Inspection 4~~~°'St~00 7 Material Testing 0.00 f 04 ,S's Total Estimated Engineering Cost '7:'00' Total Estimated Maintenance Cost `Fr33J;T78'00 Submitted: 07/20/2010 Approved: ~ 'tea 33q,~~~.SS Date Date By: - Ma or Municipal fficial ~ Title Regional Engineer Submit Four (4) Copies to Regional Engineer Page 1 of 1 Printed on 7/1/2010 7:54:08 PM BLR 14231 (Rev. 2/23/06)