SUPPLEMENTAL RESOLUTION
WHEREAS, the City Council of the City of Canton, Illinois
has heretofore taken action to provide for the improvement of Locust
and Fifth Streets in the City of Canton, Illinois under a plan
designated as 60-CS; and,
WHEREAS, motor fuel tax funds have been appropriated for
engineering costs and traffic signal adjustment; and
WHEREAS, said City desires to modify proposed storm sewer
system at the intersection of Main and Locust Streets at an estimated
cost to the City of $2,120.00,
NOW, THEREFORE, BE IT AND IT HEREBY IS RESOLVED BY THE MAYOR
AND CITY COUNCIL OF THE CITY OF CANTON, ILLINOIS that the sum of $2120.00
be, and the same hereby is, allocated and appropriated from the CITY'S
motor fuel tax for the payment of the storm sewer adjustment change
in connection with the proposed improvement of Locust and Fifth Streets
under plan designated as 60-CS.
PASSED by the City Council of t/he City of Canton, Illinoigs and
approved by the Mayor thereof this ~ ~ `t~day of ~~~ ~/ ~`'~
,, APPROVED ~ -t. ~ ,,~.
MAX
~/
ATTEST : -~
CITY CLERK
~~ .
~~
STATE OF ILLINOIS )
SS
COUNTY OF FULTON )
I, Nellie Crawford, City Clerk of the City of Canton, in
the County of Fulton, and State of Illinois, do hereby certify that
as the City Clerk of the City of Canton, I am the keeper of records,
minutes, ordinances and other books, records and papers of said City,
and that the foregoing is a true and correct copy of the Resolution
(No.~~,~) for storm surer adjustment - 60-CS Locust and Fifth, City
of Canton, Illinois. Resolution adopted by Canton City Council and
approved by the Mayor of the City of Canton on
City Cler
~// l ~/
Subscribed and sworn to before me this ~y C~ay of ~~ /~~./-
C_
2-C~.^~ _
Notary Pu lic ~ - _
,, SBI Route 78
• ~ ~ Section 135-I
• ';~'`•~• '•` ~ Main & Locust
` ~• Canton
' Fulton County
SUPPLEMENTAL AGREEMEN'I~ .~~/~
This Supplemental Agreement entered into this /~~~ day of
„~- A.D., 1974, by and between the State of Illinois,
acting thro gh its Department of Transportation, hereinafter called
the STATE, and the City of Canton of the State of Illinois, hereinafter
called the CITY, amend and supplement the Agreement between the CITY
and STATE executed by the CITY June 18, 1968, and by the STATE
September 18, 1968; and a First Supplemental Agreement signed by the
CITY February 27, 1970, and by the STATE August 19, 1970, to provide
for improving the intersection of Main and Locust Streets (FA Route 84,
SBI Route 78 and 9, marked Routes Illinois 78 and 9, State Section 135-I,
City Section 60 CS).
Add the following:
WfUrREAS, the CITY desires to modify the proposed storm sewer system at
the intersection of Main and Locust Streets to accommodate the drainage
from a downtown development project, and
WHEREAS, the STATE is agreeable to accommodate them in their proposed
construction change.
The STATE agrees to make construction changes to the storm sewer as
specified on Exhibit A, a copy of which is attached hereto and made a
part hereof.
The CITY agrees, upon completion of the improvement, to pay all
additional costs for this construction change. Such costs shall be based
on final quantities applied to the contract unit prices. The estimated
cost to the CITY is estimated to be $2,120.00.
The CITY agrees to pass a Supplemental MFT Resolution providing for
the funds to pay their share of the cost of this construction change, a
copy of which is attached hereto as Exhibit B and made a part hereof.
CITY OF CANTON
IlLiN015 D.O.T.
AFFROVED+ ~ Mayor ; /
Enpi/nee~nn~~ ~ Date ,~~~ //I~ /1 7/
FiscaF'~.+ j` ( I~ f- STATE OF ILLINOIS
L •~ : *•~..- -~- DEPARTMENT OF TRANSPORTATION
.~ ................~._.- , r
.,
Secretary
Attest:
Date
Director of Highways ~ ,
\, ~ ~ f
•
•
'" Additions:
55
~ Lin.Ft. - 24" RCCP Storm Sewer @ $30/Ft. _ $1,650
150
•
6 Lin.Ft. - 21" RCCP
T
H Storm Sewer @ $25/Ft. =
Open Lid @ $1,U50
5' Dia
A 1'
1
61 Each
Yds.
Cu _
.,
,
y.
.
- M.
- Trench Backfill @ $10 - 620
9 .
Sq.Yds. - Pavement Removal & Replacement @ $40 = 360
• Total = $3,820
Deductions:
55 Lin.Ft. - 18" RCCP Storm Sewer @ $20 = $1,100
1 Each - M.H. Ty. A, 4' Dia. Open @ $600 = 600
Total = $1,700
Net Difference = $2,120
.~-
.,}