Loading...
HomeMy WebLinkAboutResolution #3676Illinois Department of Transportation Period from 01/01/2003 ~~3676 Revised Municipal Estimate of Maintenance Costs Job No: 234-03055 Sec. 03-00000-00-GM to 12/31/2003 Municipality Canton Estimated Cost of Maintenance Operations Material. Eauioment or Labor Maintenance Operation (No. -Description -Total Quantity) Item and Specification Quantity and Unit Unit Cost Cost Operation Cost * Fee Grouo CONTRACT MAINTENANCE * 1. Bit. Hot Mix Sand Seal Coat (IV) Bit. Materials Prime Coat 2,871 Gal. $1.05 $3,014.55 (64,384 Sq. Yd.) Bit. Hot Mix Sand Seal Coat (Mod.) 4,176.5 Ton $57.00 $238,060.50 $241,075.05 GENERAL MAINTENANCE 2. Drainage Repairs (III) P.C.C. Curb & Gutter M6.05 80 Foot. $39.00 $3,120.00 HemIOCk Street Fabric 1 Roll $325.00 $325.00 $3,445.00 3. Sidewalk Repairs (II-) Ave. A by Bank Sidewalk 660 Sq. Ft. $4.25 $2,805.00 Curb 63 Foot $39.00 $2,457.00 $5,262.00 4. Street Sweeping (II) Cargo 7000 Elgin Sweeper (Public) 659 Hours $45.55 $30,017.45 $30,017.45 5. Snow & Ice Control Bulk Rock Salt 267 Ton $33.28 $8,885.76 $8,885.76 6. Bank Charges Wire Transfers 5/21 & 10/16 2 $10.00 $20.00 $20.00 Total Maintenance $288,705.26 (Preliminary Engineering (See BLR-4310 and attached sheet for Fee Schedule) $11,649.49 $11,649.49 Total Estimated Maintenance Cost $300,354.75 Submitted Janaury 20th 2004 Approved By Mayor Municipal Official Title District Engineer Submit Four (4) Copies to District Engineer 2004 BLR 8202 (Rev. 7/01)