Loading...
HomeMy WebLinkAboutResolution # 3764AGREii1~NT ~~3764 ' Illinois Department of Transportation Period from 01/01/2006 to 12/31/2006 Municipal Estimate of Maintenance Costs Section Number 06 - 00000 - 00 - GM Municipality City of Canton Estimated Cost of Maintenance Operations Maintenance For Grou III o r III Material E ui mentor Labor Operation (No. -Description) Group (l,u,ui,iv> Item Unit Quantit Unit Price Cost Operation Cost Contract Maintenance 1. Mill and Overla IV Bit Surface Removal S.Y. 9,428 10.00 $94,280.00 9,428 s. Area Refl Crack Control S.Y. 9,428 2.40 $22,627.20 Bit Mat'Is Prime Coat Gal 1,226 3.00 $3,678.00 Bit Conc Surf Cse Su er ave Mix D, N50 Ton 792 80.00 $63,360.00 183,945.20 2. Prime and HMA OL IV Bit Mat'Is Prime Coat Gal 39 3.00 $ 117.00 642 S.Y. Bit Conc Surf Cse Su er ave Mix D, N50 Ton 60 80.00 $4,800.00 4,917.00 3. Prime and HMSS OL IV Bit Mat'Is Prime Coat Gal 143 3.00 $ 429.00 2,375 S.Y. Bit Hot Mix Sand Seal Coat Mod Ton 142 75.00 $10,650.00 11,079.00 4. Testin Services I Plant Ins ection Durin Street Maint L.S. 1 1,200.00 $1,200.00 1,200.00 General Maintenance 5. Concrete Alle II Concrete C.Y. 96.3 80.00 $7,704.00 433 S.Y. Labor L. S. 1 1,375.60 $1,375.60 9,079.60 6. Street Swee in II Car o 7000 EI in Swee er Public Hour 110 45.55 $5,010.50 5,010.50 Prelimina En ineerin Base Fee $1,000.00 II $14,090.10 2% $281.80 IV $199,923.20 5% $9,997.06 T otal Da Labor Costs $14,090.10 Total Estimated Maintenance Operation Cost $215,231.30 Preliminary Engineering 11,278.86 Engineering Inspection 0.00 Material Testing 0.00 Total Estimated Engineering Cost $11,278.86 ~ Total Estimated Maintenance Cost $226,510.16 Subm By: Approved: ' Date M Regional Engineer Submit Four (4) Copies to Regional Engineer Page 1 of 1 BLR 14231 (Rev. 2/23/06) Printed on 5/24/2006 1:18:51 PM