Loading...
HomeMy WebLinkAboutResolution #5322 - local public agency engineering services agreement; cass place phase II design engineering RESOLUTION NO. 5322 A RESOLUTION APPROVING A LOCAL PUBLIC AGENCY ENGINEERING SERVICES AGREEMENT (Cass Place Phase II Design Engineering) WHEREAS, the City of Canton, Illinois (the "City") intends on making certain improvements (the"Improvements")to the bridge located on Cass Place in the City; WHEREAS, Maurer-Stutz, Inc. will provide certain engineering services to the City in relation to the Improvements; WHEREAS,Motor Fuel Tax Funds will be utilized in relation to the engineering services; WHEREAS,the Mayor and City Council have determined that it is necessary and in the best interests of the City of Canton for City to enter into the Local Public Agency Engineering Services Agreement. (as attached hereto as "Exhibit A"). NOW,THEREFORE,BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF CANTON, ILLINOIS,AS FOLLOWS: 1. That the Recitals set forth above, and all facts and statements contained therein, are found to be true and correct and are hereby incorporated and adopted as part of this Resolution; 2. That the Local Public Agency Engineering Services Agreement, attached hereto as "Exhibit A," is hereby APPROVED. 3. That the Mayor of the City of Canton,Illinois is hereby authorized to execute said Local Public Agency Engineering Services Agreement, and any other related and necessary documents, on behalf of the City of Canton. 5. That this Resolution shall be in full force and effect immediately upon its passage by the City Council of the City of Canton, Illinois and approval by the Mayor thereof. PASSED by the City Council of the City of Canton, Illinois at a regular meeting this 3rd day of August, 2021, upon a roll call vote as follows: AYES: Alderperson, Justin Nelson, Craig West, Angela Hale, Jeff Fritz, Angela Lingenfelter, Greg Gossett NAYS: None ABSENT: Alderperson Andra Chamberlin, John Lovell APP OVED: VA_A . t McDowell, Mayor ATTEST: it C-7 ,Pka�Vley-Rock, City Clerk Illinois Department Local Public Agency Of Transportation Engineering Services Agreement Agreement For Agreement Type Using Federal Funds?❑ Yes ® No MFT PE Original .... .. :..:.: ..::: .,_,. ... ... . :. - : .:::.:. CAL PUBLIC`AGENCY. :..'.':.:;:; .: . :' Local Public AgencV County Section Number Job Number City of Canton Fulton 20-00108-77-BR Pro'ect Number Contact Name Phone Number Email Ron Robinson (309) 647-5022 1 rrobinson@cantoncityhall.org SEC ION �. �. Local Street/Road Name Key Route Length Structure Number Cass Place MS 2800 029-4286 Location Termini Add.Location`.-' Over Big Creek Remove location Pro ect Description Provide Design Preliminary Engineering for the replacement of the structure carrying Cass Place over Big Creek in the City of Canton Engineering Funding ® MFT/TBP ❑ State ❑ Other Anticipated Construction Funding ❑ Federal ❑ MFTIrBP ❑ State ® Other Rebuild Illinois Bond Funds :;AGREEMENT:FQR...: .. <. ❑ Phase I-Preliminary Engineering ® Phase II-Design Engineering _:..... ;..: ..: C'ONUL STANT.; Consultant Firm Name Contact Name Phone Number Email Maurer-Stutz, Inc. Rick J.Anderson (309) 693-7615 rjanderson@mstutz.com Address city State 7in Code 3116 N. Dries Ln;Ste 100 Peoria IL 61604 THIS AGREEMENT IS MADE between the above Local Public Agency(LPA)and Consultant(ENGINEER)and covers certain professional engineering services in connection with the improvement of the above SECTION.Project funding allotted to the LPA by the State of Illinois under the general supervision of the State Department of Transportation,hereinafter called the"DEPARTMENT,"will be used entirely or in part to finance ENGINEERING services as described under AGREEMENT PROVISIONS. Since the services contemplated under the AGREEMENT are professional in nature,it is understood that the ENGINEER,acting as an individual,partnership,firm or legal entity,qualifies for professional status and will be governed by professional ethics in its relationship to the LPA and the DEPARTMENT.The LPA acknowledges the professional and ethical status of the ENGINEER by entering into an AGREEMENT on the basis of its qualifications and experience and determining its compensation by mutually satisfactory negotiations. WHEREVER IN THIS AGREEMENT or attached exhibits the following terms are used,they shall be interpreted to mean: Regional Engineer Deputy Director,Office of Highways Project Implementation,Regional Engineer,Department of Transportation Resident Construction Supervisor Authorized representative of the LPA in immediate charge of the engineering details of the construction PROJECT In Responsible Charge A full time LPA employee authorized to administer inherently governmental PROJECT activities Contractor Company or Companies to which the construction contract was awarded Printed 07/26/21 Page 1 of 10 BLR 05530(Rev.Draft) AGREEMENT EXHIBITS The following EXHIBITS are attached hereto and made a part of hereof this AGREEMENT: ® EXHIBIT A:Scope of Services ® EXHIBIT B:Project Schedule ® EXHIBIT C:Direct Costs Check Sheet ® EXHIBIT D:Qualification Based Selection(QBS)Checklist ® EXHIBIT E:Cost Estimate of Consultant Services Worksheet(BLR 05513 or BLR 05514) ® Location Map I::;':``..;THE ENGINEER- 1. To perform or be responsible for the performance of the Scope of Services presented in EXHIBIT A for the LPA in connection with the proposed improvements herein before described. 2. The Classifications of the employees used in the work shall be consistent with the employee classifications and estimated staff hours.If higher-salaried personnel of the firm,including the Principal Engineer,perform services that are to be performed by lesser-salaried personnel,the wage rate billed for such services shall be commensurate with the payroll rate for the work performed. 3. That the ENGINEER shall be responsible for the accuracy of the work and shall promptly make necessary revisions or corrections required as a result of the ENGINEER'S error,omissions or negligent acts without additional compensation. Acceptance of work by the LPA or DEPARTMENT will not relieve the ENGINEER of the responsibility to make subsequent correction of any such errors or omissions or the responsibility for clarifying ambiguities. 4. That the ENGINEER will comply with applicable Federal laws and regulations,State of Illinois Statutes,and the local laws or ordinances of the LPA. 5. To pay its subconsultants for satisfactory performance no later than 30 days from receipt of each payment from the LPA. 6. To invoice the LPA,The ENGINEER shall submit all invoices to the LPA within three months of the completion of the work called for in the AGREEMENT or any subsequent Amendment or Supplement 7. The ENGINEER or subconsultant shall not discriminate on the basis of race,color,national origin or sex in the performance of this AGREEMENT.The ENGINEER shall carry out applicable requirements of 49 CFR part 26 in the administration of US Department of Transportation(US DOT)assisted contract.Failure by the Engineer to carry out these requirements is a material breach of this AGREEMENT,which may result in the termination of this AGREEMENT or such other remedy as the LPA deems appropriate. 8. That none of the services to be furnished by the ENGINEER shall be sublet,assigned or transferred to any other party or parties without written consent of the LPA.The consent to sublet,assign or otherwise transfer any portion of the services to be furnished by the ENGINEER shall be construed to relieve the ENGINEER of any responsibility for the fulfillment of this AGREEMENT. 9. For Preliminary Engineering Contracts: (a)To attend meetings and visit the site of the proposed improvement when requested to do so by representatives of the LPA or the DEPARTMENT,as defined in Exhibit A(Scope of Services). (b)That all plans and other documents furnished by the ENGINEER pursuant to the AGREEMENT will be endorsed by the ENGINEER and affixed the ENGINEER's professional seal when such seal is required by law.Such endorsements must be made by a person,duly licensed or registered in the appropriate category by the Department of Professional Regulation of the State of Illinois.It will be the ENGINEER's responsibility to affix the proper seal as required by the Bureau of Local Roads and Streets manual published by the DEPARTMENT. (c)That the ENGINEER is qualified technically and is thoroughly conversant with the design standards and policies applicable for the PROJECT;and that the ENGINEER has sufficient property trained,organized and experienced personnel to perform the services enumerated in Exhibit A(Scope of Services). 10. That the engineering services shall include all equipment,instruments,supplies,transportation and personnel required to perform the duties of the ENGINEER in connection with this AGREEMENT(See Exhibit C). THE_LPA AGREES, 1. To certify by execution of this AGREEMENT that the selection of the ENGINEER was performed in accordance with the Professional Services Selection Act(50 ILCS 510)(Exhibit D). 2. To furnish the ENGINEER all presently available survey data,plans,specifications,and project information. 3. To pay the ENGINEER: (a)For progressive payments-Upon receipt of monthly invoices from the ENGINEER and the approval thereof by the LPA,monthly payments for the work performed shall be due and payable to the ENGINEER,such payments to be equal to the value of the partially completed work minus all previous partial payments made to the ENGINEER. (b)Final payment-Upon approval of the work by the LPA but not later than 60 days after the work is completed and reports have been made and accepted by the LPA and DEPARTMENT a sum of money equal to the basic fee as determined in this AGREEMENT less the total of the amount of partial payments previously paid to the ENGINEER Printed 07/26/21 Page 2 of 10 BLR 05530(Rev.05/07/21) shall be due and payable to the ENGINEER. (c)For Non-Federal County Projects-(605 ILCS 5/5-409) (1)For progressive payments-Upon receipt of monthly invoices from the ENGINEER and the approval thereof by the LPA,monthly payments for the work performed shall be due and payable to the ENGINEER.Such payments to be equal to the value of the partially completed work in all previous partial payments made to the ENGINEER. (2)Final payment-Upon approval of the work by the LPA but not later than 60 days after the work is completed and reports have been made and accepted by the LPA and STATE,a sum of money equal to the basic fee as determined in the AGREEMENT less the total of the amount of partial payments previously paid to the ENGINEER shall be due and payable to the ENGINEER. 4. To pay the ENGINEER as compensation for all services rendered in accordance with the AGREEMENT on the basis of the following compensation method as discussed in 5-5 10 of the BLR Manual. Method of Compensation: ❑ Percent ❑ Lump Sum ❑ Specific Rate ® Cost plus Fixed Fee: Fixed Total Compensation=DL+DC+OH+FF Where: DL is the total Direct Labor, DC is the total Direct Cost, OH is the firm's overhead rate applied to their DL and FF is the Fixed Fee. Where FF=(0.33+R)DL+%SubDL,where R is the advertised Complexity Factor and%SubDL is 10%profit allowed on the direct labor of the subconsultants. The Fixed Fee cannot exceed 15%of the DL+OH. 5. The recipient shall not discriminate on the basis of race,color,national original or sex in the award and performance of any US DOT-assisted contract or in the administration of its DBE program or the requirements of 49 CFR part 26.The recipient shall take all necessary and reasonable steps under 49 CFR part 26 to ensure nondiscrimination in the award and administration of US DOT-assisted contracts.The recipient's DBE program,as required by 49 CFR part 26 and as approved by US DOT,is incorporated by reference in this agreement.Implementation of this program is a legal obligation and failure to carry out its terms shall be treated as violation of this AGREEMENT.Upon notification to the recipient of its failure to carry out its approved program, the Department may impose sanctions as provided for under part 26 and may,in appropriate cases,refer the matter for enforcement under 18 U.S.C. 1001 and/or the Program Fraud Civil Remedies Act of 1986(31 U.S.0 3801 et seq.). i III•. " It,IS MUTUALL YAGREED 1. To maintain,for a minimum of 3 years after the completion of the contract,adequate books,records and supporting documents to verify the amount,recipients and uses of all disbursements of funds passing in conjunction with the contract;the contract and all books,irecords and supporting documents related to the contract shall be available for review and audit by the Auditor General, and the DEPARTMENT;the Federal Highways Administration(FHWA)or any authorized representative of the federal government,and to provide full access to all relevant materials.Failure to maintain the books,records and supporting documents required by this section shall establish a presumption in favor of the DEPARTMENT for the recovery of any funds paid by the DEPARTMENT under the contract for which adequate books,records and supporting documentation are not available to support their purported disbursement. 2. That the ENGINEER shall be responsible for any all damages to property or persons out of an error,omission and/or negligent act in the prosecution of the ENGINEER's work and shall indemnify and save harmless the LPA,the DEPARTMENT,and their officers,agents and employees from all suits,claims,actions or damages liabilities,costs or damages of any nature whatsoever resulting there from.These indemnities shall not be limited by the listing of any insurance policy. The LPA will notify the ENGINEER of any error or omission believed by the LPA to be caused by the negligence of the ENGINEER as soon as practicable after the discovery.The LPA reserves the right to take immediate action to remedy any error or omission if notification is not successful;if the ENGINEER fails to reply to a notification;or if the conditions created by the error or omission are in need of urgent correction to avoid accumulation of additional construction costs or damages to property and reasonable notice is not practicable. 3. This AGREEMENT may be terminated by the LPA upon giving notice in writing to the ENGINEER at the ENGINEER's last known post office address.Upon such termination,the ENGINEER shall cause to be delivered to the LPA all drawings,plats,surveys, reports,permits,agreements,soils and foundation analysis,provisions,specifications,partial and completed estimates and data, if any from soil survey and subsurface investigation with the understanding that all such materials becomes the property of the LPA.The LPA will be responsible for reimbursement of all eligible expenses incurred under the terms of this AGREEMENT up to the date of the written notice of termination. Printed 07/26/21 Page 3 of 10 BLR 05530(Rev.05/07/21) 4. In the event that the DEPARTMENT stops payment to the LPA,the LPA may suspend work on the project.If this agreement is suspended by the LPA for more than thirty(30)calendar days,consecutive or in aggregate,over the term of this AGREEMENT, the ENGINEER shall be compensated for all services performed and reimbursable expenses incurred prior to receipt of notice of suspension.In addition,upon the resumption of services the LPA shall compensate the ENGINEER,for expenses incurred as a result of the suspension and resumption of its services,and the ENGINEER's schedule and fees for the remainder of the project shall be equitably adjusted. 5. This AGREEMENT shall continue as an open contract and the obligations created herein shall remain in full force and effect until the completion of construction of any phase of professional services performed by others based upon the service provided herein.All obligations of the ENGINEER accepted under this AGREEMENT shall cease if construction or subsequent professional services are not commenced within 5 years after final payment by the LPA. 6. That the ENGINEER shall be responsible for any and all damages to property or persons arising out of an error,ornission and/or negligent act in the prosecution of the ENGINEER's work and shall indemnify and have harmless the LPA,the DEPARTMENT, and their officers,employees from all suits,claims,actions or damages liabilities,costs or damages of any nature whatsoever resulting there from.These indemnities shall not be limited by the listing of any insurance policy. 7. The ENGINEER and LPA certify that their respective firm or agency: (a)has not employed or retained for commission,percentage,brokerage,contingent fee or other considerations,any firm or person(other than a bona fide employee working solely for the LPA or the ENGINEER)to solicit or secure this AGREEMENT, (b)has not agreed,as an express or implied condition for obtaining this AGREEMENT,to employ or retain the services of any firm or person in connection with carrying out the AGREEMENT or (c)has not paid,or agreed to pay any firm,organization or person(other than a bona fide employee working solely for the LPA or the ENGINEER)any fee,contribution,donation or consideration of any kind for,or in connection with, procuring or carrying out the AGREEMENT. (d)that neither the ENGINEER nor the LPA is/are not presently debarred,suspended,proposed for debarment, declared ineligible or voluntarily excluded from covered transactions by any Federal department or agency, (e)has not within a three-year period preceding the AGREEMENT been convicted of or had a civil judgment rendered against them for commission of fraud or criminal offense in connection with obtaining,attempting to obtain or performing a public(Federal,State or local)transaction;violation of Federal or State antitrust statutes or commission of embezzlement,theft,forgery, bribery,falsification or destruction of records,making false statements or receiving stolen property. (f) are not presently indicated for or otherwise criminally or civilly charged by a government entity(Federal, State,or local)with commission of any of the offenses enumerated in paragraph and (g)has not within a three-year period preceding this AGREEMENT had one or more public transaction(Federal,State, local)terminated for cause or default. Where the ENGINEER or LPA is unable to certify to any of the above statements in this clarification,an explanation shall be attached to this AGREEMENT. 8. In the event of delays due to unforeseeable causes beyond the control of and without fault or negligence of the ENGINEER no claim for damages shall be made by either party.Termination of the AGREEMENT or adjustment of the fee for the remaining services may be requested by either party if the overall delay from the unforeseen causes prevents completion of the work within six months after the specified completion date.Examples of unforeseen causes included but are not limited to:acts of God or a public enemy;acts of the LPA,DEPARTMENT,or other approving party not resulting from the ENGINEER's unacceptable services;fire;strikes;and floods. If delays occur due to any cause preventing compliance with the PROJECT SCHEDULE,the ENGINEER shall apply in writing to the LPA for an extension of time.If approved,the PROJECT SCHEDULE shall be revised accordingly. 9. This certification is required by the Drug Free Workplace Act(30 ILCS 580).The Drug Free Workplace Act requires that no grantee or contractor shall receive a grant or be considered for the purpose of being awarded a contract for the procurement of any property or service from the DEPARTMENT unless that grantee or contractor will provide a drug free workplace. False certification or violation of the certification may result in sanctions including,but not limited to suspension of contract on grant payments,termination of a contract or grant and debarment of the contracting or grant opportunities with the DEPARTMENT for at least one(1)year but not more than(5)years. For the purpose of this certification,"grantee"or"Contractor"means a corporation,partnership or an entity with twenty-five(25) or more employees at the time of issuing the grant or a department,division or other unit thereof,directly responsible for the specific performance under contract or grant of$5,000 or more from the DEPARTMENT,as defined the Act. The contractor/grantee certifies and agrees that it will provide a drug free workplace by: (a)Publishing a statement: (1)Notifying employees that the unlawful manufacture,distribution,dispensing,possession or use of a controlled substance,including cannabis,is prohibited in the grantee's or contractor's workplace. (2)Specifying actions that will be taken against employees for violations of such prohibition. (3)Notifying the employee that,as a condition of employment on such contract or grant,the employee will: (a)abide by the terms of the statement;and (b)notify the employer of any criminal drug statute conviction for a violation occurring in the workplace no later than(5)days after such conviction. (b)Establishing a drug free awareness program to inform employees about: (1)The dangers of drug abuse in the workplace; Printed 07/26/21 Page 4.of 10 BLR 05530(Rev.05/07/21) (2)The grantee's or contractor's policy to maintain a drug free workplace; (3)Any available drug counseling,rehabilitation and employee assistance program;and (4)The penalties that may be imposed upon an employee for drug violations. (c)Providing a copy of the statement required by subparagraph(a)to each employee engaged in the performance of the contract or grant and to post the statement in a prominent place in the workplace. (d)Notifying the contracting,or granting agency within ten(10)days after receiving notice under part(b)of paragraph (3)of subsection(a)above from an employee or otherwise,receiving actual notice of such conviction. (e)Imposing a sanction on,or requiring the satisfactory participation in a drug abuse assistance or rehabilitation program. (f)Assisting employees in selecting a course of action in the event drug counseling,treatment and rehabilitation is required and indicating pial a(rained iefeiral team is in place. Making a good faith effort to continue to maintain a drug free workplace through implementation of the Drug Free Workplace Act, the ENGINEER,LPA and the Department agree to meet the PROJECT SCHEDULE outlined in EXHIBIT B.Time is of the essence on this project and the ENGINEER's ability to meet the PROJECT SCHEDULE will be a factor in the LPA selecting the ENGINEER for future projects.The ENGINEER will submit progress reports with each invoice showing work that was completed during the last reporting period and work they expect to accomplish during the following period. 10. Due to the physical location of the project,certain work classifications may be subject to the Prevailing Wage Act(820 ILCS 130/0.01 et seq.). 11. For Preliminary Engineering Contracts: (a)That tracing,plans,specifications,estimates,maps and other documents prepared by the ENGINEER in accordance with this AGREEMENT shall be delivered to and become the property of the LPA and that basic survey notes, sketches,charts,CADD files, related electronic files,and other data prepared or obtained in accordance with this AGREEMENT shall be made available,upon request to the LPA or to the DEPARTMENT,without restriction or limitation as to their use.Any re-use of these documents without the ENGINEER involvement shall be at the LPA's sole risk and will not impose liability upon the ENGINEER. (b)That all reports,plans,estimates and special provisions furnished by the ENGINEER shall conform to the current Standard Specifications for Road and Bridge Construction,Bureau of Local Roads and Streets Manual or any other applicable requirements of the DEPARTMENT,it being understood that all such furnished documents shall be approved by the LPA and the DEPARTMENT before final acceptance.During the performance of the engineering services herein provided for,the ENGINEER shall be responsible for any loss or damage to the documents herein enumerated while they are in the ENGINEER's possession and any such loss or damage shall be restored at the ENGINEER's expense. ..... . ..: .... .., AGREEMENT,SUMMARY;::;;',:.:'::; ::. :::=: -•`.- , .:. Prime Consultant TIN/FEIN/SS Number Agreement Amount Maurer-Stutz, Inc. 27-1013849 $58,654.50 Subconsultants TIN/FEIN/SS Number Agreement Amount Subconsultant Total Prime Consultant Total $58,654.50 Total for all work $58,654.50 ;:;Add Suti'consultant AGREEMENT.. IGN .:.URE S_. .:_•1:":° ;::....`'::`: Executed by the LPA: Local Public Agency Type Name of Local Public Agency Attes/t'� The City of Canton B l j Date By Date A10,I ! Name&-Local Public Agency Local Public Agency Type Title Canton City Clerk Mayor Printed 07/26/21 Page 5 of 10 BLR 05530(Rev.05107/21) Executed by the ENGINEER: Consultant Firm Name Attest: Maurer-Stutz, Inc. BV fi Date By _ Date Ti Title Senior Project Engineer Principal APPROVED: Re ional En ineer,Department of Transportation Date Printed 07/26/21 Page 6 of 10 BLR 05530(Rev.05/07121) Local Public Agency County Section Number City of Canton Fulton 20-00108-77-BR EXHIBIT A SPE ., COOF SERVICES To perform or be responsible for the performance of the engineering services for the LPA,in connection with the PROJECT herein before described and enumerated below Prepare needed permits. Make complete general and detailed plans, special provisions, proposals and estimates of cost. Assist the LA in the tabulation and interpretation of the contractors' proposals and prepare needed contracts. Printed 07/26/21 Page 7 of 10 BLR 05530(Rev.05/07/21) Local Public A enc County Section Number City of Canton I Fulton 20-00108-77-BR .,. :. . :. X - t'R OJECT SCHEDULE Project Begins September 1, 2021 Complete ROW Plats and Legal Descriptions November 1, 2021 Complete PS&E December 30, 2021 Anticipated Letting Date March 15, 2021 Project Completion Date May 15, 2022 Printed 07/26/21 Page 8 of 10 BLR 05530(Rev.05/07/21) Local Public A ncy County Section Number City of Canton Fulton 20-00108-77-BR ..., ....... . Ex hibit C. DiO.46osfs Check Sheet, List ALL direct costs required for this project.Those not listed on the form will not be eligible for reimbursement by the LPA on this project. Item Allowable Quantity Contract Rate Total Lodging Actual cost ❑(per GOVERNOR'S TRAVEL CONTROL BOARD) (Up to state rate maximum) Lodging I axes and Fees Actual Cost ❑(per GOVERNOR'S TRAVEL CONTROL BOARD) ❑Air Fare Coach rate,actual cost,requires minimum two weeks' notice,with prior IDOT approval Vehicle Mileage Up to state rate maximum ❑(per GOVERNOR'S TRAVEL CONTROL BOARD) ❑Vehicle Owned or Leased $32.50/half day(4 hours or less)or$65/full day 0.5 $65.00 $32.50 ❑Vehicle Rental Actual cost(Up to$55/day) ❑Tolls Actual cost ❑Parking Actual cost ❑Overtime Premium portion(Submit supporting documentation) ❑Shift Differential Actual cost(Based on firm's policy) ❑Overnight Delivery/Postage/Courier Service Actual cost(Submit supporting documentation) ❑Copies of Deliverables/Mylars(In-house) Actual cost(Submit supporting documentation) ❑Copies of Deliverables/Mylars(Outside) Actual cost(Submit supporting documentation) ❑Project Specific Insurance Actual Cost ❑Monuments(Permanent) Actual Cost [:],Photo Processing Actual Cost ❑2-Way Radio(Survey or Phase III Only) Actual Cost ❑Telephone Usage(Traffic System Monitoring Only) Actual Cost ®CADD Actual cost(Max$15/hour) 207 $10.00 $2,070.00 ❑Web Site Actual cost(Submit supporting documentation) ❑Advertisements Actual cost(Submit supporting documentation) ❑Public Meeting Facility Rental Actual cost(Submit supporting documentation) ❑Public Meeting Exhibits/Renderings&Equipment Actual cost(Submit supporting documentation) ❑Recording Fees Actual Cost ❑Transcriptions(specific to project) Actual Cost ❑Courthouse Fees Actual Cost ❑Storm Sewer Cleaning and Televising Actual cost(Requires 2-3 quotes with[DOT approval) ❑Traffic Control and Protection Actual cost(Requires 2-3 quotes with[DOT approval) ❑Aerial Photography and Mapping Actual cost(Requires 2-3 quotes with[DOT approval) ❑Utility Exploratory Trenching Actual cost(Requires 2-3 quotes with IDOT approval) [],Testing of Soil Samples Actual Cost ❑Lab Services Actual Cost(Provide breakdown of each cost) ❑Equipment and/or Specialized Equipment Rental Actual Cost(Requires 2-3 quotes with IDOT approval) El Ell Total Direct Costs $2,102.50 Printed 07/26/21 Page 9 of 10 BLR 05530(Rev.05/07/21) Local Public A ncy County Section Number City of Canton Fulton 20-00108-77-BR Exhibit t (ex i D Qualification Based Selection(QBS)Checklist :: The LPA must complete Exhibit D.If the value meets or will exceed the threshold in 50 ILCS 510,QBS requirements must be followed. Under the threshold,QBS requirements do not apply.The threshold is adjusted annually.If the value is under the threshold with federal funds being used,federal small purchase guidelines must be followed. ❑ Form Not Applicable(engineering services less than the threshold) Items 1-13 are required when using federal funds and(1135 process Is applicable.Items 14-16 are required when using State funds and the QBS process is applicable. No Yes 1 Do the written QBS policies and procedures discuss the initial administration(procurement,management ❑ ❑ and administration)concerning engineering and design related consultant services? 2 Do the written QBS policies and procedures follow the requirements as outlined in Section 5-5 and ❑ ❑ specifically Section 5-5.06(e)of the BLRS Manual? 3 Was the scope of services for this project clearly defined? ❑ ❑ 4 Was public notice given for this project? ❑ ❑ 5 Do the written QBS policies and procedures cover conflicts of interest? ❑ ❑ 6 Do the written QBS policies and procedures use covered methods of verification for suspension and ❑ ❑ debarment? 7 Do the written QBS policies and procedures discuss the methods of evaluation? ❑ ❑ Project Criteria Weighting 8 Do the written QBS policies and procedures discuss the method of selection? ❑ ❑ Selection committee titles for this project Top three consultants ranked for this project in order 1 2 3 9 Was an estimated cost of engineering for this project developed in-house prior to contract negotiation? ❑ ❑ 10 Were negotiations for this project performed in accordance with federal requirements. ❑ ❑ 11 Were acceptable costs for this project verified? ❑ ❑ 12 Do the written QBS policies and procedures cover review and approving for payment,before forwarding ❑ ❑ the request for reimbursement to[DOT for further review and approval? Do the written QBS policies and procedures cover ongoing and finalizing administration of the project 13 (monitoring,evaluation,closing-out a contract, records retention,responsibility, remedies to violations or ❑ ❑ breaches to a contract,and resolution of disputes)? 14 QBS according to State requirements used? ❑ 15 Existing relationship used in lieu of QBS process? ❑ 16 LPA is a home rule community(Exempt from QBS). ® ❑ Printed 07/26/21 Page 10 of 10 BLR 05530(Rev.05/07/21) PROJECT LOCATION MAP City of Canton, Fulton County Cass Place (MS 2800) Section 20-00108-77-BR LOCATION JAI 0 MYiaT LE ST vtra� w s IL VIN CH XT u FC1 <ti .� ..ru- �C w L W u FAt V1E"� C�AkSS <f Z. aFRU G� MILE. ST rr � F LOCUST PAP aP P� �L v � r 9 •.ry 1 F�A P a � 22 • `� NO I I CHESTNUT ' • a PARK ELM 0 PINE k- _ EXHIBIT E Illinois Department COST ESTIMATE OF CONSULTANT SERVICES WORKSHEET of Transportation FIXED RAISE Local Public Agency County Section Number - , . - - Cit of.,Canton . u Consultant(Firm) Name Prepared By Date Ash iS•;.;<?`, �?f:';:'.:'i,'.:;i'a;�t,. >TG3 ..Inc.... . ...... ,. _ ..... .. . .., Maurer Stutz, :: PAYROLL ESCALATION TABLE CONTRACT TERM 15 MONTHS OVERHEAD RATE . 160:73% START DATE 811/2021 COMPLEXITY FACTOR 10 RAISE DATE ...:.:,',:.: 7/1/2022 %OF RAISEI 2.00% END DATE 10/31/2022 ESCALATION PER YEAR % of Year First Date Last Date Months Contract 0 8/1/2021 7/1/2022 11 73.33% 1 7/2/2022 11/1/2022 4 27.20% The total escalation = 0.53% BLR 05514(Rev.04/30/21) Payroll Escalation Printed 7/26/2021 9:46 AM Page 1 of 1 Local Public Agency County Section Number ICi ty of Canton I Fulton 120-00108-77-BR MAXIMUM PAYROLL RATE 78.00 ESCALATION FACTOR I 0.53%1 PAYROLL RATES Exhibit E Cost Estimate of Consultant Services Worksheet Fixed Raise IDOT CLASSIFICATION PAYROLL RATES CALCULATED RATE ON FILE -Q0 $62.33 $51.77 $41.22 P $34.43 q4.?51 SEVI $50.27 PLS.IVII $45-,00 $45.24 Des Tech V.. $30.25 $30.41 D6s- 6611' ,T -76 $28.90 $28. $ $30:00 30.16 BLR 05514(Rev.04/30/21) Payroll Rates Printed 7/2612021 9:47 AM Page 1 of 1 Local Public Agency County Section Number City of Canton IFulton 20-00108-77-BR COST ESTIMATE WORKSHEET Exhibit E Cost Estimate of Consultant Services Worksheet Fixed Raise OVERHEAD RATEI 160.73%1 COMPLEXITY FACTOR TASK STAFF HOURS PAYROLL OVERHEAD&FRINGE DIRECT COSTS FIXED FEE SERVICES BY TOTAL %OF GRAND BENEFITS OTHERS TOTAL Roadway:Design r...;..:. r:, 50 1,756 2,823 .;,':,:. 450 580 .?;.,:_ .."' ,..: 5,609 9.56% Structure,Design:..;:.: ":.',:;:r.:'r:::" 51 2,025 3,255 :: 668 !.c.': ::;:. ;;?. 5,948 10.14% Plan Sheet Development';. _. : 210 7,413 11,915 1;490 2,446 r 23,264 39.66° QUant1ty..Ca1c6ati6ns. ;:a:<.;`:::.:. 5;: ..:: 54 1,973 3,172 :::',,: ;.; 651 ".:1;':' '.' 5,796 9.88% Pick-up:Survey.: :: ':::`. ;'.i:.''r:,.':;. 6 196 315 ..: ;:; ::.:. ..,:..'::'.:43 65 :'r'::..::' 619 1.06% FieldCheck(Includes:P;l=N).;:.f :.::::. :::::.;:. 8 345 554 114 `:' :'; 1,013 1.73/° ° I SubmitFrefinalPSBE: ':,r.,;:..,: 9 294 473 :: s :`' ;.• ::: :,...._: 97 .. 864 1.47% Meetings.• 6 230 370 ''.i:: ''.:{ : ;;`'''}'i:`':... 76 `..`.^,.' "''' ` 676 1.15% Estimate of Time.;..•.. .:..;. 4 207 333 68 608 1.04% 80 709 1.21% Esfimate•of.Cost:.::;=...,i`'::::::,5:`.:".,<": 6 241 388 r. .; Special Provisions.;:: •`.:::`..`;is:"r:',''.'?;<;i:,;:;- : :::`:.,: 16 759 1,220 .:;.:`.>'.::�..;::',.':.:..;,::;-; 250 .. :_: -..c t•,:;:.. '- 2,229 3.80°0 QualityAssu'rance ..;•s: `': ".: ..`:: :.; 22 1,135 1,824 r' ':_ ::..:: i el>:.`,'.'..;'; 374 ::. 3,333 5.68% 7 293 471 ,:;.::> :':' ..;..':. ':. 97 :`.,° ''' '' 861 1.47% . 18 610 981 120 201 ;'`;,. '..•.'` 1,912 3.26% FinaIPS&E;Revisions-°":"_:'.:::'>.;';:;:::;:; : •.: Conference.and:Review ;,` 10 469 755 : 155 ': 1,379 2.35% Administration-and•Management',;:°. ;..:..,;... 9 361 581 119 1,061 1.81% Shop-Drawing Review:::.::`: 8 339 545 112 `.:`: .':.:... 996 1.70% Answer;Construction.Q'uestions.' 16 605 973 ::,:::, 200 1,778 3.03% va Subconsultant DL U - TOTALS 510 19,251 30,948 2,103 6,353 58,655 100.00% 50,199 BLR 05514(Rev.04/30/21) Cost Estimate Worksheet Printed 7/26/2021 9:47 AM Page 1 of 1 Local Public Agency._ County Section Number City of Canton Fulton 20-00108-77-BR AVERAGE HOURLY PROJECT RATES Exhibit E Cost Estimate of Consultants Services Worksheet Fixed Raise SHEET 1 OF 4 PAYROLL AVG TOTAL PROJ.RATES Roadway Design Structure Design Plan Sheet Development Quantity Calculations Pick-up Survey HOURLY Hours % Wgtd Hours % Wgtd Hours % Wgtd Hours % Wgtd Hours % Wgtd Hours % Wgtd CLASSIFICATION RATES Part. Avg Part. Avg Part. Avg Part. Avg Part. Avg Part. Avg PE VIII 62.33 7.0 1.37% 0.86 PE VI 51.77 57.0 11.18% 5.79 2'.: 4.00% 2.07 -Al .: 5.24% 2.71 PE V 41.22 8.0 1.57% 0.65 PE IV 34.43 265.0 51.96% 17.89 48': 96.00% 1 33.06 -34"s 66.67% 22.96 1 - 97':'. 46.19% 15.90 .'. '36,V•; 66.67% 22.96 SE VI 50.27 65.0 12.75% 8.41 17 '. 33.33% 16.76 28;': 12.38% 6.22 ;,10`; 18.52% 9.31 PLS VII 45.24 1.0 0.20% 0.09 1 - 16.67% 7.54 Des Tech V 30.41 1.0 0.20% 0.06 1 16.67% 5.07 Des Tech IV 28.90 102.0 20.00% 5.78 <-78:'.'' 36.19% 10.46 8 14.81% 4.28 Tech V 30.16 4.0 0.78% 0.24 4, '> 66.67% 20.11 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 TOTALS 1 1 510.0 1 100% $37.75 50.0 1 100.00% $35.13 51.0 100% $39.71 210.0 100% $35.30 54.0 100% $36.55 6.0 100% $32.72 BLR 05514(Rev.04/30/21) Printed 7/26/2021 9:48 AM Page 1 of 1 Avg Hourly 1 Local Public Agency County Section Number City of Canton I Fulton 20-00108-77-BR AVERAGE HOURLY PROJECT RATES Exhibit E Cost Estimate of Consultant Services Worksheet Fixed Raise SHEET 2 OF 4 PAYROLL AVG Field Check(Includes P-1-H) Submit Prefinal PS&E Meetings Estimate of Time Estimate of Cost Special Provisions HOURLY Hours % Wgtd Hours % Wgtd Hours % Wgtd Hours % Wgtd Hours % Wgtd Hours % Wgtd CLASSIFICATION RATES Part. Avg Part. Avg Part. Avg Part. Avg Part. Avg Part. Avg PE VIII 62.33 PE VI 51.77 4 50.00% 25.89 „1;'!; 11.11% 5.75 2', 33.33% 17.28 4 100.00% 51.77 ='';2`i'.; 33.33% 17.26 '12 75.00% 38.83 PE V 41.22 PE IV 34.43 4 :,, 50.00% 17.22 .2';'r 22.22% 7.65 2',_.. 33.33% 11.48 ,;''4'.: 66.67% 22.96 4 25.00% 8.61 SE VI 50.27 PLS VII 45.24 Des Tech V 30.41 Des Tech IV 28.90 6i•',:; 66.67% 19.27 '2 33.33% 9.63 Tech V 30.16 i TOTALS 8.0 100% $43.10 9.0 100% $32.67 6.0 100% $38.37 4.0 100% $51.77 6.0 100% $40.21 16.0 100% $47.44 BLR 05514(Rev.04/30/21) Printed 7/26/2021 9:48 AM Page 1 of 1 Avg Hourly 2 Local Public Agency County Section Number City of Canton Fulton 20-00108-77-BR AVERAGE HOURLY PROJECT RATES Exhibit E Cost Estimate of Consultant Services Worksheet Fixed Raise SHEET 3 OF 4 Administration and PAYROLL AVG Quality Assurance Permitting Final PS&E Revisions Conference and Review Management Shop Drawing Review HOURLY Hours % Wgtd Hours % Wgtd Hours % Wgtd Hours % Wgtd Hours % Wgtd Hours % Wgtd CLASSIFICATION RATES Part. Avg Part. Avg Part. Avg Part. Avg Part. Avg Part. Avg PE VIII 62.33 - -4'_;_ 18.18% 11.33 20.00% 12.47 =;.;1. 11.11% 6.93 PE VI 51.77 '<'8::_: 36.36% 18.83 ',3(;:' 42.86% 22.19 2 > 11.11% 5.75 4'..'; 40.00% 20.71 ';;2:.1 22.22% 11.51 PE V 41.22 PE IV 34.43 2':.i': 9.09% 3.13 4. 57.14% 19.68 44.44/0 0 .;r; 8 .:. 15.30 .,,::4'::'<`' 40.00% 13.77 o-':i4';: 44.44% 15.30 4` 50.00% 17.22 SE VI 50.27 8', 36.36% 18.28 4':' 50.00% 25.13 PLS VII 45.24 Des Tech V 30.41 Des Tech IV 28.90 44.44% 12.85 -2:';," 22.22% 6.42 Tech V 30.16 TOTALS 22.0 100% $51.57 7.0 100% $41.86 18.0 100% $33.90 10.0 100% $46.95 9.0 100% $40.16 8.0 100% $42.35 BLR 05514(Rev.04/30/21) Avg Hourly 3 Printed 7/26/20219:49 AM Page 1 of 1 Local Public Agency County Section Number City of Canton IFulton I 120-00108-77-BR AVERAGE HOURLY PROJECT RATES Exhibit E Cost Estimate of Consultant Services Worksheet Fixed Raise SHEET 4 OF 4 Answer Construction PAYROLL AVG questions HOURLY Hours % Wgtd Hours % Wgtd Hours % Wgtd Hours % Wgtd Hours % Wgtd Hours % Wgtd CLASSIFICATION RATES Part. Avg Part. Avg Part. Avg Part. Avg Part. Avg Part. Avg PE VIII 62.33 PE VI 51.77 PE V 41.22 8. c: 50.00% 20.61 PE IV 34.43 ':8 50.00% 17.22 SE VI 50.27 PLS VII 45.24 Des Tech V 30.41 Des Tech IV 28.90 Tech V 30.16 TOTALS 16.0 100% $37.83 0.0 0% $0.00 0.0 0% $0.00 0.0 0% $0.00 1 0.0 1 0% $0.00 0.0 0% $0.00 BLR 05514(Rev.04/30/21) Printed 7/26/2021 9:49 AM Page 1 of 1 Avg Hourly 4 Illinois Department of Transportation, Office of Highways Project Implementation /Region 31 District 4 401 Main Street/Peoria, Illinois 61602-1111 August 23, 2021 Ms. Diana Pavley-Rock; City Clerk CCity ofYCanton 2 North Main'Street . Canton, Illinois 61.520 Motor Fuel Tax (MFT).Funds City of Canton Section No: 20-00108-77-13R Cass Place over Big.Creek Request for Expenditure/Authorization of MFT Funds Dear Ms. Pavley-Rock: The authorization to_expend $33,489:45 of MFT funds for Preliminary Engineering services for this section has been approved and should appear on the City's next MFT transaction detail. If you have any questions, please contact Mr. Simon Alwan at (309) 671-3694. Sincerely, Kensil A.. Garnett, P.E. Region.Three Engineer SJA/jjs ' s:\gen\winword\blrs\staff\alwan\transmittals&letters\req expen_auth\regexpautli_canton_20-00108-77-br_pe_1.docx cc: Mr. Keith Plavec, Maurer-Stutz, Inc. . File o 'a Illinois ®epat'�llerrt Request for Expenditure/Authorization Of nspOitiOn of Motor Fuel Tax Funds Local Public Agency Type County Section Number City of Canton City Fulton 20-00108-77-BR 1 hereby request authorization to expend Motor Fuel Tax Funds as indicated below: Purpose Motor Fuel Tax Amount Rebuild Illinois Amount County Engineer/Superintendent Salary&Expenses n/a Contract Construction Day Labor Construction Engineering $270.00 Engineering Investigations IMRF/Social Security n/a Maintenance Maintenance Engineering Obligation Retirement n/a Other Right-of-Way(Itemized on 2nd page) TOTAL $270.00 Comments January 31, 2021 Invoice#40796 Local Public Agency Official Date DIVISION of HIGHWAYS Dept, of Transportation Title AUG 13 2021 Imayor Region 31District 4 Approved RECEIVED Regional Engineer 6onal FtOads Department of Transportation Date Department of Transportation Use Entered By Date Printed 08110,121 Page 1 of 2 SLP.09150(Rev.07/31120) January 31, 2021 MAUe STUTZ Project No: 24721004.00 � raGi ,, aS 5 uR E `,' CR5 Invoice No: 40796 Invoice Please Remit To:3116 N Dries Ln.Ste,100 Peoria,IL 61604 Ron Robinson City of Canton 2 N.Main Street Canton, IL 61520 Project 24721004.00 Cass Place Bridge Replacement Preliminary Engineering Topographic survey, hydraulics, soil borings, preliminary bridge design and hydraulic report preparation and submittal to IQQT for approval(Preliminary.Engineering) Section 20-00108-77-BR Professional Services from January 1, 2021 to J'anuaty 31. 2021 Professional Personnel Hours Rate Amount Professional Engineer VI 1.25 16100 200.00 Professional Land Surveyor Vll .50 140.00 70.00 Totals 1.75 270.00 Total Labor 270.00 Total this Invoice $270.00 H�GhVJ PY � p1v�S��N 0 ransP°�ta�`0 . � � rr 021 3lpiskc\at 4 uv Re9\R ce\\1e ds 1.oca\Roe - o� •o [iGnois DepartmentRequest for Expenditure/Authoriization of Transportation of Motor Fuel "fax Funds o:.• Local Public Agency Type County - Section Number City of Canton City Fulton 20-00108-77-BR I hereby request authorization to expend Motor Fuel Tax Funds as-indicated below: Purpose Motor Fuel Tax Amount Rebuild Illinois Amount County Engineer/Superintendent Salary 8 Expenses n/a Contract Construction Day Labor Construction Engineering $7,088.25 Engineering Investigations IMRF/Social Security n/a Maintenance Maintenance Engineering Obligation Retirement n/a Other Right-of-Way(Itemized on 2nd page) TOTAL. $7,088.25 Comments February 28, 2021 Invoice#40903 Local Public Agency Official Date ofi H�GhwP�S IS�ON spottati��n ®ePt 01 ��a� �021 Tit Nk5 13 Mayor �egip°31 Dist 4 VED Approved 1 o`a�Roads Regional Engineer De artment of Transportation Date Department of Transportation Use Entered By Date Printed 08/10/21 Page 1 of 2 BLR 09150(Rev.07/31/20) February 28,2021 - Project No: 24721004.00 hdG ! t: "e c" R s U ft s r Y o r s Invoice No. 40903 � voiceIn Please Remit To:3116 N Dries Ln.Ste.100 Peoria,IL 61604 Ron Robinson City of Canton . 2 N.Main Street Canton, IL 61520 Project 24721004.00 Cass Place Bridge Replacement Preliminary Engineering Topographic survey, hydraulics, soil borings,preliminary bridge design and hydraulic report preparation and submittal to IDOT for approval (Preliminary Engineering) Section 20-00108-77-BR Professional Services from Eebrija y 1.2021 to FebruaryM2M Professional Personnel Hours Rate ,Amount Engineer 111 1.00 107.00 107.00 Professional Engineer VI 2.75 160.00 440.00 Professional Engineer VI .25 175.00 43,75 Professional Land Surveyor IV 6.50 115.00 747.50 Professional Land Surveyor VI 12.75 140.00 1,785.00 Scientist/Design Technologist V 3.25 100.00 325.00 One Member Survey Crew 22.00 115.00 2530.00 Two Member Survey Crmv 12,00 92.50 1,110.00 Totals 60,50 7,088.25 Total Labor 7,088.25 v Total this Invoice $7,088.25 of HIGhWAYS p�e1S10j TranSPortation ® P AUG 13 2021 RegiO° 31 District 4 RECEIVED 4,,at Roads 11&nOis ®2pa 1 Request for Expenditure/Authorization Of �►�I'lrSpOt$�tlOtl of Motor Fuel Tax Funds Local Public Agency Type County Section Number City of Canton City I Fulton I 20-00108-77-13R I hereby request authorization to expend Motor Fuel Tax Funds as indicated below: Purpose Motor Fuel Tax Amount Rebuild Illinois Amount County Engineer/Superintendent Salary&Expenses n/a Contract Construction Day Labor Construction Engineering $2,204.50 Engineering Investigations IMRF/Social Security n/a Maintenance Maintenance Engineering Obligation Retirement n/a Other Right-of-Way(Itemized on 2nd page) TOTAL" $2,204.50 Comments March 31, 2021 Invoice#41045 0{ \G�►2N�R Local Public Agency Official Date Dept. p�G 3101 Title tU�g1(1Cti$ R4GIR cE���o Mayor RE Roads - 'vo°a` Approved Regional Engineer Department of Transportation Date Department of Transportation Use Entered By Date IL Printed 08/10/21 Page 1 of 2 BLR 09150(Rev.0'/31/20) March 31,2021 E—_ — , Project No: 24721004.00 E h; G ! t; E E F. S S L R :/ E J P C Invoice No: 41045 involace Please Remit To:3116 N Dries I1.Ste.100 Peoria,IL 61604 Ron Robinson City of Canton 2 N. Main Street Canton,IL 61520 Project 24721004.00 Cass Place Bridge Replacement Preliminary Engineering Topographic survey, hydraulics, soil borings, preliminary bridge design and hydraulic report preparation and submittal to IDOT for approval(Preliminary Engineering) Section 20-00108-77-BR Professional Services from March 1. 2Q21 to March 31. 2021 Professional Personnel Hours Rate Amount Engineer ill 13.50 107.00 1,444.50 Professional Engineer VI 4.75 160.00 760.00 Totals 18.25 2,204.50 Total Labor 2,204.50 Total this Invoice $2,204.50 SAYS p1�1510� ° GIA Dapt. Of 13101� wu iie9tRECEtV f0 t,oca► Roads tlGnois Department Request for Expenditure/Authorization of Transp®rtafion of Motor Fuel Tax Funds o Local Public Agency Type County Section Number City of Canton City Fulton 20-00108-77-BR I hereby request authorization to expend Motor Fuel Tax Funds as indicated below: Purpose Motor Fuel Tax Amount Rebuild Illinois Amount County Engineer/Superintendent Salary&Expenses n/a Contract Construction Day Labor Construction Engineering $4,233.75 Engineering Investigations IMRF/Social Security n/a Maintenance Maintenance Engineering Obligation Retirement n/a Other I i Right-of-Way(Itemized on 2nd page) TOTAL $4,233.75 Comments April 30, 2021 Invoice#41139 N S Local Public A encv Official Date ON °a>1sP°ttat\o �ept° 0 T le p�G �lvlayor EC��S1t1°t Ete9�p° S\\J Approved 1d001 Road?, Regional Engineer Department or Transportation Date i Department of Transportation Use Entered By Date Printed 08i10J21 Page 1 of 2 Bl-R 09150(Rev.07i31/20) April 30, 2021 ® — p Project No: 24721004.00 c N a l r-: :. G R S S U K, V 'c 1' O R S ' Invoice No: 41139 involece Please Remit To;3116 N Dries Ln.Ste.100 Peoria,IL 61604 Ron Robinson- City of Canton 2 N. Main Street Canton, IL 61520 Project 24721004.00 Cass Place Bridge Replacement Preliminary Engineering Topographic survey, hydraulics,soil borings,preliminary bridge design and hydraulic report preparation and submittal to IDOT for approval(Preliminary Engineering) Section 20-00108-77-BR Professional SeMcgg from April ,2021 to Aoril 30.2021 Professional Personnel Hours Bate Amount Engineer III 10.00 107.00 1,070.00 Professional Engineer VI' 13.25 160.00 2,120.00 Sciendst/De,kign Technologist III 3.00 80.00 240.00 Scientist/Design Technologist IV 4.26 90.00 382.50 Structural Engineer VI 2.50 160.00 400.00 Technician IV .25 85.00 21.25 Tbtals 33.25 4,233.75 Total Labor 4,233.75 Total this Invoice $4,233.75 D���S�DN-�ransp°�tiat�On - DP pistctct 4 Re91 REc EO�oca1 Roads llrino'ts ®e ft Request for Expenditure/Authorization Of 11�pOrt3tiOrt of Motor Fuel Tax Funds Local Public Agency Type County Section Number City of Canton City I Fulton I 20-00108-77-BR I hereby request authorization to expend Motor Fuel Tax Funds as indicated below: Purpose Motor Fuel Tax Amount Rebuild Illinois Amount County Engineer/Superintendent Salary&Expenses n/a Contract Construction Day Labor Construction Engineering $8,173.70 Engineering Investigations IMRF/Social Security n/a Maintenance Maintenance Engineering Obligation Retirement n/a Other Right-of-Way(Itemized on 2nd page) TOTAL $8,173.70 Comments May 31, 2021 Invoice #41317 N Nx S Local Public Aqency Official Date p1Vti � - Car � � I Dept, D Title puG �I��stciot INlayor RECER�adJ Approved taAoe Regional Engineer Department of Transportation Date Department of Transportation Use Entered By Date Printed 08/10/21 Page t of 2 DLR 09150(Rev.07/31/20) May 31, 2021 Project No: 24721004.00 E Giid Ec" n" C CUf E }' FRS Invoice No: 41317 Please Remit To:3116 N Dries ln.5te,100 Peoria,tl 61604 . Ron Robinson City of Canton 2 N. Main Street Canton, IL 61520 Project 24721004.00 Cass Place Bridge Replacement Preliminary Engineering Topographic survey, hydraulics,soil borings, preliminary bridge design and hydraulic report preparation and submittal to IDOT for approval(Preliminary Engineering) Section 20-00108-77-BR ProtressiQnal Services from May 1 2021 to May 2oa1 Professional Personnel Hours Efate Amount Engineer 11 31.50 97.00 3,055.50 Engineer ill 3.00 107.00 321.00 Professional Engineer VI 15.50 160.00 2,480.00 Scientist/Design Technologist IV 10.00 90.00 900.00 ScientisUDesign Technologist V 2.50 100.00 250.00 Structural Engineer VI 7.00 160.00 1,120.00 - Totals 69.50 8,126.50 Total Labor 8,126.50 Reimbursable Expenses Lab Fees 5112/2021 PDC LABORATORIES,INC. ACM Eva[&Env Fee 47.20 Total Reimbursables 1.0 times 47.20 4.7.20 Total this Invoice $8,173.70 o� HtiGWWAYS p��11S�oN ortation Dept of Tra�Sp 13 �021 . Re9�RE0E1VEDct 4 , Local Road° InvoicePDC Laboratories, Inc. (800) 752-6651 I9463683 tie Customer#: 232679 Invoice To: Remit To: Accounts Payable PDC Laboratories, Inc. Maurer Stutz.lnc.-Peoria PO Box 74007633 3116 N. Dries Lane, Suite 100 Chicago, IL 60674-7633 Peoria, IL 61604 Project#: 24721004.00 Invoice: I9463683 Work Order: ED05099 Date: 5/12/21• Received: 4/28/21 Terms: NET 30-Subject to a 1.5%finance charge Project: Maure'rAsbestos Contact: . George Merkle Quantity Description Matrix Unit Cost' Extended Cost 1 ACM Evaluation Solid 43.70 43.70 1 Environmental Fee-Solid Solid. 3.5.0 3.50 Total: $47.20 Please contact Erin Lane if you have any questions_regarding this invoice. elane@pdclab.com PLEASE RETURN BOTTOM PORTION WITH YOUR PAYMENT PDC Laboratories,Inc. . Invoice Amount (800)752-6651 19463683 232679 5/12/21 $47.20 71 Accounts Payable Show Amount $ Maurer Stutz Inc.-Peoria Paid,Here 3116 N. Dries Lane, Suite 100 Make checks payable to: PDC Laboratories, Inc. Peoria, IL 61604 PDC Laboratories, Inc. PO Box 74007633 Chicago, IL 60674-7633 Page 1 of 1 e 116nois Dep7-tr�t�t Request for Expenditure/Authorization of ltisportatiOn of Motor Fuel Tax Funds a;.. Local Public Agency Type County Section Number (City of Canton City Fulton 20-00108-77-BR I hereby request authorization to expend Motor Fuel Tax Funds as indicated below: Purpose Motor Fuel Tax Amount Rebuild Illinois Amount County Engineer/Superintendent Salary&Expenses n/a Contract Construction Day Labor Construction Engineering $3,178.00 Engineering Investigations IMRF/Social Security n/a Maintenance Mainteriance Engineering Obligation Retirement n/a Other Right-of-Way(Itemized on 2nd page) TOTAL_ $3,178.00 Comments June 30, 2021 Invoice#41331 A�S Local Public Agency Official Date °f >ra Vv Dep�a Au{+ IS 2021 Title �+ l� 31015tcicti Mayor Re9�0�CE1VE0 °Gat Rosd� Approved Regional Engineer Department of Transportation Date Department of Transportation Use Entered By Date 7 Printed 08/10/21 Page 1 of 2 BLR 09150(Rev_07131/20) June 30, 2021 Project No: 24721004.00 E Fd G I ai: E E R S 5 L° R V z Y 0 n S Invoice No: 41331 Invoice Please Remit To:3116 N Dries Ln.Ste,100 Peoria,!L 61604 Ron Robinson City of Canton 2 N. Main Street Canton, IL 61520 Project 24721004.00 Cass Place Bridge Replacement Preliminary Engineering Topographic survey, hydraulics, soil borings, preliminary bridge design and hydraulic report preparation and submittal to IDOT for approval(Preliminary Engineering) Section 20-00108-77-BR Pr&ssianal Services from June 1 2021 to June 30 2021 Professional Personnel Hours Rate Amount Engineer II .75 97.00 72.75 Engineer 111 8.25 107.00 882.75 Professional Engineer VI 5.00 160.00 800.00 Professional Land Surveyor VII .25 140.00 35.00 Scientist/Design Technologist IV 7.25 90.00 652.50 Scientist/Design Technologist V1 5.00 122.00 610.00 Technician 1 2.50 50.00 125.00 Totals 29.00 3,178.00 Total Labor 3,178.00 Total this Invoice $3,178.00 01 H�G�wAOn Dept. p���S1001 ,�rans�0rratl - 0 13 202� Region 31 gisttict Q RScON]E ag L.acel Rpe llfinoas ®e Request for Expenditure/Authorization ®f'3�t��95�3i�ti0lre of Motor Fuel Tax Funds Local Public Agencv Type County Section Number City of Canton City Fulton 20-00108-77-BR I hereby request authorization to expend Motor Fuel Tax Funds as indicated below: Purpose Motor Fuel Tax Amount Rebuild Illinois Amount County Engineer/Superintendent Salary&Expenses n/a i Contract Construction Day Labor Construction Engineering $8,341.25 Engineering Investigations IMRF/Social Security n/a Maintenance Maintenance Engineering Obligation Retirement n/a Other Right-of-Way(Itemized on 2nd page) TOTAL $8,341.25 Comments July 31, 2021 Invoice#41477 Local Public Agency Official Date 01 D�v�S�DN��nspe�tat1e Dept. .1 ® Titte auG I. 2 Imayor e3101a«k0t e9�R GE1"jeda Approved 1,pesl Roa Regional Engineer Department of Transoortation Date Department of Transportation Use Entered By Data - ' L :9��� .Printed 08110r2i -Page I of 2 BLR H150(Rev.07/31/20) July 31,2021 Project No: 24721004.00 ENGI ,JF. FR5 > >Uav Y0as Invoice No: 41477 ,Invoice Please Remit To;3116 N Dries Ln.Sfe.100 Peoria,IL 61604 Ron Robinson City of Canton 2 N. Main Street Canton, IL 61520 Project 24721004.00 Cass Place Bridge Replacement Preliminary Engineering Topographic survey, hydraulics, soil borings, preliminary bridge design and hydraulic report preparation and submittal to IDOT for approval(Preliminary Engineering) Section 20-00108-77-BR Professional Services frot2 1 2021 to Jut 3�1 202� Professional Personnel Hours Rate Amount Engineer 11 17.75 100.00 1,775.00 Engineer IV 3.50 115.00 402.50 Professional Engineer IV 3.00 135.00 405.00 Professional Engineer VI 18.25 165.00 3,011.25 Professional Engineer VII .25 180.00 45.00 Professional Land Surveyor VI .25 145.00 36.25 Scientist/Desion Technologist IV 11.25 95.00 1,068.75 ScientisUDesign Technologist V 3.ob 105.00 315.00 Structural Engineer V1 6.50 165.00 1,072.50 Technician 1 1.50 60.00 90.00 One Member Survey Crew 1.00 120.00 120.00 Totals 66.25 8,341.25 Total Labor 8,341.25- Total this Invoice $81,341.25 G�+WP�S D N` °�tat�0n�S Tte�SP �V Dept• puG 1310�1 � 310�St�1ct V14o e�Road� • J