Loading...
HomeMy WebLinkAboutResolution #1088~~1088 Project CANTON, CITY OF C17 2206 RESOLUTION RE~ARDIN~ PROJECT PERFORMANCE STANDARDS Whereas, the regulations of the U.S. Environmental Protection Agency regarding grants for construction of sewage treatment works, 40 CFR 35,2214, requires that the of CANTON certify one year a ter a ate ofi`~n~tiation of opera ion o e project whether the project can meet the applicable performance standards, and Whereas, before the said certification can be made and before Step 3 building is initiated, the applicable project performance standards must be established; Therefore, be it resolved this 18th day of JUNE 19 85 , that the performance standards app Ica a or the useful-'f~ e o e project shall be as listed below, as well as the enforceable requirements of the Clean Water Act and the plans and specifications which the project was planned, designed, and built. 1, For load limits computed based on a design .average flow (DAF) of 3.4bP1GD and a design maximum flow (DMF) of 8.34 MGD- e effluent for discharge number(s)0o1 & 002 sTiaTT be limited as identified in NPDES Permit #. 00 7272 839 (reference the final water Quality and effluent standards and limitations), and/or 2. Under design conditions, there shall be no overflows, surcharges, or basement backups associated with the separate sanitary collection system. 8327-03-8 Page 2 Based upon the cost-effectiveness analysis of the Sewer System Evaluation Survey Final .Report for the cis ... of ate an es~im~~quan i y o P1~ o n ra on and MGD of inflow was pro3ected to be poten~i ally removable from the s,vstem. 3, Remarks: Name i ,~ ~ ~~-~ Title: ayor, , Certified to be a true and accurate copy, passed and adopted on the above.date. Name: Title: er (SEAL) ,~ 8327-03-8