HomeMy WebLinkAbout#5218 IDOT Ash St 111nois D@partntent Resolution for Improvement
a o
of Transportation Under the Illinois Highway Code o, ;
Resolution Number Resolution Tvoe Section Number
a2 Supplemental 09-00099-00-EG
BE-IT RESOLVED,by the Council of the City
Governing Body Type Local Public Agency Type
of Carlton Illinois that the following described street(s)/road(s)/structure be improved under
Name of Local Public Agency
the Illinois Highway Code.Work shall be done by Contract
Contract or Day Labor
For Roadway/Street improvements:
Name of Street(s)/Road(s) Length(miles) Route From To
Ash Street FAIJ
6883
For Structures:
Name of Street(s)/Road(s) Existing Route Location Feature Crossed
Structure No.
BE IT FURTHER RESOLVED,
1. That the proposed Improvement shall consist of
Material Testing for the Construction Engineering (Phase 111)for the 2009 Canton ARRA (Stimulus) Projects.
2. That there is hereby appropriated the sum of one thousand three hundred ninety one &601100
Dollars( $1,391.60 )for the improvement of
said section from the Local Public Agency's allotment of Motor Fuel Tax funds.
BE IT FURTHER RESOLVED,that the Clerk is hereby directed to transmit four(4)certified originals of this resolution to the district office
of the Department of Transportation.
I, Diana Pavley-Rock City Clerk-in and for said City
Name of Clerk Local Public Agency Type Local Public Agency Type
of Canton in the State aforesaid,and keeper of the records and files thereof,as provided by
Name of Local Public Agency
statute,do hereby certify the foregoing to be a true,perfect and complete original of a resolution adopted by
Council of Canton at a meeting held on December 17, 2019
Governing Body Type Name of Local Public Agency Date
IN TESTIMONY WHEREOF, l have hereunto set my hand and seal this 17th day of December, 2019
Day Month,Year
(SEAL) Clerk S• ature
Approved
Regional Engineer
De artment of Transportation Date
Printed 12/06/19 BLR 09110(Rev.02/08/19)
Illinois Department of Transportation
Office of Highways Project Implementation I Region'3/District 4:
401 Main Street/P,eoria;Illinois 61602-1111
January 3, 2020
Ms. Diana Pavley=Rock, City Clerk
Citof�Canto❑
2 North Main Street
Canton, Illinois 61520
-. - --- Municipal=Motor Fuel-Tax-(MFT)
City of Canton
Section No. 09-00099-00-EG
Dear.Ms::Pavley-Rock: .
The supplemental Resolution for Improvement Under the Illinois Highway Code
(BLR 09.110) adopted.by the City Council of Canton on December. 17, 2019,
appropriating $1,391.90 of MFT funds for this section was approved on December.
3.0, 2019.
With the additional funds appropriated above, a_total of$56,476.85 of MFT funds.
has been appropriated for this improvement.
This resolution provides for the improvement of various locations for the 2009
American Recovery and:Reinstatement Act(ARRA-2009) projects.
NOTE:: Approval of-this resolution does not authorize expenditure of MFT
funds. Proper documentation'must:be received by our.office prior to paying
any bills out of the MFT account.
If you have any questions, please.contact your IDOT Local Roads Field Engineer,
- - Mr:°Mark.Oaten, at(309) 671-3688: "--_- - - - -
Sincerely,
D
Kensil A. Garnett, P.E.
Region Three Engineer
MJO/JJs s:\gen\winword\blrs\stafflotten\letters\resolutions blr 09110\canton.09-00099-00-eg.suppres.docx
Attachments
cc: Maurer-Stutz, Inc.
Documentation Review
File
' D D
Illinois Department Resolution for Improvement
of Transportation Under the Illinois Highway Code o,
Resolution Number Resolution Tv e Section Number
Supplemental I 09-00099-00-EG
BE IT RESOLVED, by the Council of the City
Governing Body Type Local Public Agency Type
of Canton Illinois that the following described street(s)/road(s)/structure be improved under
Name of Local Public Agency
the Illinois Highway Code.Work shall be done by Contract
Contract or Day Labor
For Roadway/Street improvements:
Name of Street(s)/Road(s) Length(miles) Route From To
+Ash Street FAU
6883
For Structures:- - - -- - - -- - - - - -- — -- - - -
Name of Street(s)/Road(s) Existing Route Location Feature Crossed
Structure No.
BE IT FURTHER RESOLVED,
1. That the proposed improvement shall consist of
Material Testing for the Construction Engineering (Phase 111) for the 2009 Canton ARRA (Stimulus) Projects.
2. That there is hereby appropriated the sum of one thousand three hundred ninety one& 60/100
Dollars( $1,391.60 )for the improvement of
said section from the Local Public Agency's allotment of Motor Fuel Tax funds.
BE IT FURTHER RESOLVED,that the Clerk is hereby directed to transmit four(4)certified originals of this resolution to the district office
of the Department of Transportation.
I, Diana Pavley-Rock City Clerk in and for said City
Name of Clerk Local Public Agency Type Local Public Agency Type
of Canton in the State aforesaid,and keeper of the records and files thereof, as provided by
Name of Local Public Agency
statute,do hereby certify the foregoing to be a true, perfect and complete original of a resolution adopted by
Council of Canton at a meeting held on December 17, 2019
Governing Body Type- -- -- Name,oftocal Public Agency - Date
IN TESTIMONY WHEREOF, I have hereunto set my hand and seal this 17th day of December, 2019
Day Month,Year
(SEAL) Clerk Si na e
Approved
Regional Engineer
Department of Transportation Date
u-()3-20-20
Printed 12/06%19 BLR 09110(Rev.02/08/19)
Illinois Department
of Transportation. TRANSMITTAL LETTER
Division of.Highways/Region Three/District Four■401 Main Street■ Peoria, Illinois 61602-1111 ■Telephone 309/671-3333
Date: January 3, 2020
To: City of_Cariton_y Route: First St
2 North Main Street Section: 14-00105-00-SW
Canton, Illinois 61520
County: Fulton
Job No.:
Contract No.:
Attention: Ms. Diana Pavley-Rock, City Clerk Agency: City of Canton
Subject: Approved-Request for-Approval-of Change in-Plans (BL-R 13210)
Transmittal Sent As Marked Below:
❑ For Processing/Approval ❑ Other(See Remarks) ❑ Returned for Corrective Action
❑ For Your Information/Response ❑ Per Our Conversation ❑ Review and Comments
® Note and File ❑ Per Your Request ❑ Take Appropriate Action
Description and/or Remarks:
Attached is the approved Request for Approval of Change in Plans (BLR 13210)for the above-mentioned project on
First Street in Canton, Illinois. The Final Pay Request is pending approval upon satisfactory materials/documentation
review.
If you have any questions, please contact Mr. Mark Otten at(309) 671-3688.
Kensil A. Garnett, P.E.
Region Three Engineer
MJO/jjs
Attachment(s) l
cc: Mr. Keith Plavec, Maurer-Stutz
Documentation Review
File
s:\gen\winword\blrs\staff\otten\transmittal farms\fulton\municipalities\canton\cityofcanton_14-00105-00-sw changeinplansappr.docx
Printed 1/3/2020 D4 AD0101 (Rev.04/27/16)
Illinois Department Request for Approval
of Transportation of Change in Plans
Date: 12/10/2019 County: Fulton
Request No. 1 x❑ Final Road District or Municipality: City of Canton
Contractor: Laverdiere Construction Section No. 14-00105-00-SW
Address: 4055 W Jackson St
Macomb IL 61455
1 recommend that this -deduction-.--- be-made -from the above-contract. -
(addition,extension,deduction) (to,from)
The estimated quantities are shown below and the contractor agrees to furnish the materials and do the work at the unit prices.
Item Description Unit Quantity Unit Price Addition(A)or Total Addition Total Deduction
P ty Deduction(D)
TRENCH BACKFILL CU YD 2.00 84.00 A $ 168.00 $ -
PC CONC SIDEWALK 4 SQ FT 965.10 12.75 D $ - $ 12,305.03
DETECTABLE WARNINGS SQ FT 12.60 48.15 D $ - $ 606.69
COMB CURB GUTTER REM FOOT 3.10 12.65 A $ 39.22 $ -
PAVT PATCH T2 8 SQ YD 19.40 103.00 A $ 1,998.20 $ -
CONCRETE COLLAR CU YD 0.60 1,200.00 A $ 720.00 $ -
STORM SEW CL A 1 15 FOOT 19.00 90.85 D $ - $ 1,726.15
STORM SEW CL B 1 10 FOOT 12.10 72.85 A $ 881.49 $ -
STORM SEW CL B 2 10 FOOT 12.00 102.00 A $ 1,224.00 $ -
STORM SEWER REM 15 FOOT 9.50 32.00 A $ 304.00 $ -
WATER VALVES ADJUST EACH 7.00 178.00 A $ 1,246.00 $ -
INLETS TAT3F&G EACH 1.00 1,585.00 A $ 1,585.00 $ -
INLETS ADJUST NEW T3F&G EACH 1.00 825.00 D $ - $ 825.00
PC CONC SIDEWALK 4 SP SQ FT 1230.50 13.70 A $ 16,857.85 $ -
INLETS REMOVED SPL EACH 1.00 155.00 A $ 155.00 $ -
COMB CC&G TB MOD FOOT 11.00 35.20 A $ 387.20 $ -
GAS VALVE ADJUSTED EACH 1.00 190.00 A $ 190.00 $ -
SEGMENT CONC BLK WALL SQ FT 631.00 29.00 D $ - $ 18,299.00
$ - $ -
$ - $ -
$ - $ -
Total Changes: $ 25,755.95 $ 33,761.87
BLR 13210 (Rev.11/07/13)
Printed 12/10/2019 1 of 2
Total Net Change: $ (8,005.92)
Amount of Original Contract: $ 227,172.75
Amount of Previous Change Orders:
Amount of adjusted/final contract: $ 219,166.84
Total net deduction to date $ (8,005.92) which is -3.52 %of the contract price.
(addition,deduction)
State fully the nature and reason for the change: Final field measurements
When the net increase or decrease in the cost of the contract is$10,000.00 or more,or the time of completion is increased or
decreased by 30 days or more,one of the following statements must be checked:
F1 The undersigned has determined that the circumstances which necessitate this change were not reasonably foreseeable at
the time the contract was signed.
The undersigned has determined that the change is germane to the original contract as signed.
The undersigned has determined that this change is in the best interest of the Local Agency and is authorized by law.
I
Prepared by: George B.Merkle
Senior Project Engineer-Maurer Stutz,Inc.
Title of Preparer
For County and Road District Projects For Municipal Projects
i
Highway Commissioner Municipal icer
Date Title o unix al Offs r
Submitted/Approved
County Engineer/Superintendent of Highways Approved
Date
Regional Engineer
01-03- aDa-0
Date
Note: Make out separate form for change in length quantities.
Give net quantities
Submit 6 Originals
If plans are required attached 3 sets.
BLR 13210 (Rev.11/07/13)
Printed 12/10/2019 2 of 2
Illinois Department Request for Approval
of Transportation of Change in Plans
Date: 12/10/2019 County: Fulton
Request No. 1 x❑ Final Road District or Municipality: City of Canton
Contractor: Laverdiere Construction Section No. 14-00105-00-SW
Address: 4055 W Jackson St
Macomb IL 61455
I recommend that this deduction be made from the above contract.
(addition,extension,deduction) (to,from)
The estimated quantities are shown below and the contractor agrees to furnish the materials and do the work at the unit prices.
Item Description Unit Quantity Unit Price Addition(A)or Total Addition Total Deduction
Deduction(D)
TRENCH BACKFILL CU YD 2.00 84.00 A $ 168.00 $ -
PC CONC SIDEWALK 4 SQ FT 965.10 12.75 D $ - $ 12,305.03
DETECTABLE WARNINGS SQ FT 12.60 48.15 D $ - $ 606.69
COMB CURB GUTTER REM FOOT 3.10 12.65 A $ 39.22 $ -
PAVT PATCH T2 8 SQ YD 19.40 103.00 A $ 1,998.20 $ -
CONCRETE COLLAR CU YD 0.60 1,200.00 A $ 720.00 $ -
STORM SEW CL A 1 15 FOOT 19.00 90.85 D $ - $ 1,726.15
STORM SEW CL B 1 10 FOOT 12.10 72.85 A $ 881.49 $ -
STORM SEW CL B 2 10 FOOT 12.00 102.00 A $ 1,224.00 $ -
STORM SEWER REM 15 FOOT 9.50 32.00 A $ 304.00 $ -
WATER VALVES ADJUST EACH 7.00 178.00 A $ 1,246.00 $ -
INLETS TAT3F&G EACH 1.00 1,585.00 A $ 1,585.00 $ -
INLETS ADJUST NEW T3F&G EACH 1.00 825.00 D $ - $ 825.00
PC CONC SIDEWALK SP SQ FT 1230.50 13.70 A $ 16,857.85 $ -
INLETS REMOVED SPL EACH 1.00 155.00 A $ 155.00 $ -
COMB CC&G TB MOD FOOT 11.00 35.20 A $ 387.20 $ -
GAS VALVE ADJUSTED EACH 1.00 190.00 A $ 190.00 $ -
SEGMENT CONC BLK WALL SQ FT 631.00 29.00 D $ - $ 18,299.00
$ - $ -
Total Changes: $ 25,755.95 $ 33,761.87
BLR 13210 (Rev.11/07/13)
Printed 12/10/2019 1 of 2
Total Net Change: $ (8,005.92)
Amount of Original Contract: $ 227,172.75
Amount of Previous Change Orders:
Amount of adjusted/final contract: $ 219,166.84
Total net deduction to date $ (8,005.92) which is -3.52 %of the contract price.
(addition,deduction)
State fully the nature and reason for the change: Final field measurements
When the net increase or decrease in the cost of the contract is$10,000.00 or more, or the time of completion is increased or
decreased by 30 days or more,one of the following statements must be checked:
F1 The undersigned has determined that the circumstances which necessitate this change were not reasonably foreseeable at
the time the contract was signed.
The undersigned has determined that the change is germane to the original contract as signed.
The undersigned has determined that this change is in the best interest of the Local Agency and is authorized by law.
Prepared by: George B. Merkle
Senior Project Engineer-Maurer Stutz,Inc.
Title of Preparer
For County and Road District Projects For Municipal Projects
C, I/V\X
Highway Commissioner � Municipaler
ic
Date Title of uun'ici I Offic
111 !11 CI
Submitted/Approved Date
County Engineer/Superintendent of Highways Approved
Date
Regional Engineer
D I –03—D-6QLO
Date
Note: Make out separate form for change in length quantities.
Give net quantities
Submit 6 Originals
If plans are required attached 3 sets.
BLR 13210 (Rev.11/07/13)
Printed 12/10/2019 2 of 2
Illinois Department Request for Approval
of Transportation of Change in Plans
Date: 12/10/2019 County: Fulton
Request No. 1 x❑ Final Road District or Municipality: City of Canton
Contractor: Laverdiere Construction Section No. 14-00105-00-SW
Address: 4055 W Jackson St
Macomb IL 61455
1 recommend that this deduction be made from the above contract.
(addition,extension,deduction) (lo,from)
The estimated quantities are shown below and the contractor agrees to furnish the materials and do the work at the unit prices.
Item Description Unit Quantity Unit Price Addition(A)or Total Addition Total Deduction
Deduction(D)
TRENCH BACKFILL CU YD 2.00 84.00 A $ 168.00 $ -
PC CONC SIDEWALK SQ FT 965.10 12.75 D $ - $ 12,305.03
DETECTABLE WARNINGS SQ FT 12.60 48.15 D $ - $ 606.69
COMB CURB GUTTER REM FOOT 3.10 12.65 A $ 39.22 $ -
PAVT PATCH T2 8 SQ YD 19.40 103.00 A $ 1,998.20 $ -
CONCRETE COLLAR CU YD 0.60 1,200.00 A $ 720.00 $ -
STORM SEW CL A 1 15 FOOT 19.00 90.85 D $ - $ 1,726.15
STORM SEW CL B 1 10 FOOT 12.10 72.85 A $ 881.49 $ -
STORM SEW CL B 2 10 FOOT 12.00 102.00 A $ 1,224.00 $ -
STORM SEWER REM 15 FOOT 9.50 32.00 A $ 304.00 $ -
WATER VALVES ADJUST EACH 7.00 178.00 A $ 1,246.00 $ -
INLETS TAT3F&G EACH 1.00 1,585.00 A $ 1,585.00 $ -
INLETS ADJUST NEW T3F&G EACH 1.00 825.00 D $ - $ 825.00
PC CONC SIDEWALK 4 SP SQ FT 1230.50 13.70 A $ 16,857.85 $ -
INLETS REMOVED SPL EACH 1.00 155.00 A $ 155.00 $ -
COMB CC&G TB MOD FOOT 11.00 35.20 A $ 387.20 $ -
GAS VALVE ADJUSTED EACH 1.00 190.00 A $ 190.00 $ -
SEGMENT CONC BLK WALL SQ FT 631.00 29.00 D $ - $ 18,299.00
$ - $ -
Total-Changes:1 $ 25,755.95 $ 33,761.87
BLR 13210 (Rev.11/07/13)
Printed 12/10/2019 1 of 2
' J
Total Net Change: $ (8,005.92)
Amount of Original Contract: $ 227,172.75
Amount of Previous Change Orders:
Amount of adjusted/final contract: $ 219,166.84
Total net deduction to date $ (8,005.92) which is -3.52 %of the contract price.
(addition,deduction)
State fully the nature and reason for the change: Final field measurements
When the net increase or decrease in the cost of the contract is$10,000.00 or more,or the time of completion is increased or
decreased by 30 days or more,one of the following statements must be checked:
The undersigned has determined that the circumstances which necessitate this change were not reasonably foreseeable at
the time the contract was signed.
The undersigned has determined that the change is germane to the original contract as signed.
The undersigned has determined that this change is in the best interest of the Local Agency and is authorized by law.
Prepared by: George B. Merkle
Senior Project Engineer-Maurer Stutz,Inc.
Title of Preparer
For County and Road District Projects For Municipal Projects
u�
Highway Commissioner Municipal icer
i
Date flitf M Officer
Submitted/Approved 1 Date
County Engineer/Superintendent of Highways Approved
Date
_ k A
Regional Engineer
o l- 03-2-aao
Date
Note: Make out separate form for change in length quantities.
Give net quantities
Submit 6 Originals
If plans are required attached 3 sets.
BLR 13210 (Rev.11/07/13)
Printed 12/10/2019 2 of 2
Illinois Department ofrTransportation
Office of Highways Project Implementation I Region 31 District 4
401 Main Street I Peoria, Illinois 61.602-1111
January 6, 2020
°Ms. Diana Pavley-Rock, City Clerk
2 North 'Main Street
Canton,Illinois 61520
:Funding—M� otor Fuel Tax(MFT)..
Ci y of Canfon_ _�- •
Section No.: 04-00.0.93-05-WR
. .ear Ms, av ey- oc
:The supplemental Resolution for-Improvement Under the Illinois Highway
:Code (BLR 0911 0) adopted by the City Council of Canton on December 1.T' -
2019, appropriating $300.50 of MFT funds for this section was approved on
December 30, 2019. ;
With the additional:funds appropriated above, a total of$81;;986.50 of MFT
funds has been appropriated,for this section.
This resolution provides for the preliminary engineering of 20th Avenue.
*NOTE_ : Approval of this resolution does not authorize expenditure of MFT
funds Proper documentation must,be,received by our office prior to
paying any bills out of-the MFT Account.
If you have any questions; please contact Mr. Mark Otten at (309)671-3688.
Sincerely,
0.
:Kensil A. Garnett, P.E.
Region Three Engineer .
MJO/jjs
s:\gen\winword\blrs\staff\otten\letters\resolutions blr 09110\canton.04-00093-05-wr.suppres:docx
:Attachments
cc: Maurer-Stutz, Inc.. .
Documentation Review
File
116nois Department Resolution for improvement
oho
of Transportation Under the Illinois Highway Code 1W.
.
Resolution Number Resolution Type Section Number
Supplemental 04-00093-05-WR
BE IT RESOLVED, by the Council of the City
Governing Body Type Local Public Agency Type
of Canton Illinois that the following described street(s)/road(s)/structure be improved under
Name of Local Public Agency
the Illinois Highway Code.Work shall be done by Contract
Contract or Day Labor
For Roadway/Street improvements:
Name of Street(s)/Road(s) Length(miles) Route From To
20th Avenue FAU
6893
For Structures:
Name of Street(s)/Road(s) Existing Route Location Feature Crossed
Structure No.
BE IT FURTHER RESOLVED,
1. That the proposed improvement shall consist of
Preliminary Engineering for the design of 20th Avenue from Chestnut Street to north of Ash Street
2. That there is hereby appropriated the sum of three hundred &50/100
Dollars
( $300.50 for the improvement of
said section from the Local Public Agency's allotment of Motor Fuel Tax funds.
BE IT FURTHER RESOLVED,that the Clerk is hereby directed to transmit four(4)certified originals of this resolution to the district office
of the Department of Transportation.
I; Diana Pavley-Rock City Clerk in and for said City
Name of Clerk Local Public Agency Type Local Public Agency Type
of Canton in the State aforesaid,and keeper of the records and files thereof,as provided by
Name of Local Public Agency
statute,do hereby certify the foregoing to be a true, perfect and complete original of a resolution adopted by
Council of Canton at a meeting held on December 17, 2019
Governing Body Type Name of Local Public Agency Date
IN TESTIMONY WHEREOF, I have hereunto set my hand and seal this 17th day of December, 2019
Day Month,Year
(SEAL) _ Clerk Si ature
Approved
Regional Engineer
Department of Transportation Date
D Cq