Resolution for Improvement by Municipality Construction
Under the Illinois Hf~hway Cods
BE IT RESOLVED, by the coL~NCIL of the
Couoefl a -rMteltptl Ana owro d Trwt~
CITY
of
CANTON
Clfy. Tam a VII4a
that the following described street(s) be improved under the Illinois Highway Code:
Name of Thorou hfare Route From To
CHESTNUT STREET FAU 6884 WEST OF FIRST AVENUE 100' EAST GF EIGHTH AVEN
BE IT FURTHER RESOLVED, WIDENING CHESTNUT STREET INSTALLING TRAFFIC
1. That the proposed improvement shall consist of
SIGNALS AT CHESTNUT STREET AND FIFTH AVENUE: INSTALLING NEW CURB AND GUTTER ALONG THE
~~ NANCY WHITES
I, i~f@~f Clerk
Mra.
in and for the CITY of CANTON
Icy. Tam a Vlllptd
County of FULTON ,hereby certify the
and be designated as Section 91-00081-O1-FP
(foregoing to be a true, perfect and complete copy of a resolution adopted by
the COUNCIL
IcounNl a PraM~nt ono Bor,rO ttl TruuoN)
2. That there is hereby appropriated the (additional) sum of FTVF. ~nlrsaNn
Dollars (S 5 , 000.00 )for the
improvement of said section from the municipality's allotment of Motor Fuel Tax funds.
3. That work shall be done by CONTRACT ;and,
feo~ety Contna a Or,r heal
BE IT FURTHER RESOLVED, that the Clerk is hereby directed to transmit two certified copies of this resolution to
the district office of the Department of Transportation.
APPROVED
19
ato.nm.m of TnnnpaLtfon
aanet snort...
su~.~o3tA.~. eren
Il 4~-0362
at a meeting on
(COUnCit o- -rpd~e,t t1n0 lou0 d Trwt«sl
DECEMBER 7 ~ 19 93
IN TESTIMONY WHEREOF, I have hereunto set my hand and seal this
and shall be constructed VARIES 44' To 36'
- day of
(SEAL)
,Illinois
feet wide
r.~as
}
TO: Mayor Edwards, City Council Members, City Treasurer
and City Clerk
FRCM: Tracie L. Skaggs
RE: East Chestnut Street Project
D14TE: August 9, 1993
Please be informed that the East Chestnut Street project is
progressing on schedule, if not ahead of schedule. McClure
Engineering has informed me that they have reached 78°k of their
total engineering fee and feel that there may possibly be an extra
in engineering costs of approximately $5,000 to $10,000, I am
informing you of this so that if we do run over, you will be able to
pass a resolution for MFT funds to be expended for this purpose.
All storm sewer is now in place except for the south side of
Chestnut Street between 1st and 2nd Avenues. Ail curb and gutter
should be in place by Friday, August 13, except for the above
mentioned area. I am pushing to pour drives and walks from 8th
Avenue to 2nd Avenue prior to disturbing the businesses between 1st
and 2nd Avenues.
''~
ADDENDUM #2 TO
CONSTRUCTION ENGINEERING
SERVICES AGREEMENT FOR
MOTOR FUEL TAX FUNDS
Local Agency: Consultant:
City of Canton McClure Engineering Associates, Inc.
Fulton County P. 0. Box 593, 716 E. Jackson
Section 91-00081-O1-FP Macomb, IL 61455
Project No. STP-M-5007(6)
Job #C-94-216-92
Revise Item 4 of the LA Agrees basis of payment to read: "Time and
Material not to exceed X50,000 without prior approval of the LA."
SUCCESSORS AND ASSIGNS
That the LA and the ENGINEER bind themselves, their successors,
executors, administrators, and assigns to the other party of this
AGREEMENT as modified herein, and to the successors, executors,
administrators, and assigns of such other party in respect to all
covenants of this AGREEMENT as modified herein.
Executed by the LA: City of Canton of the State of
Illinois~--,, acting by and through its
Attest: City Cduncil
i
By: ~' ~ ~ ~ ~ ~ ~ By: ~L'O)-
ity C rk Mayor, City of Canton
(Seal)
Executed by the Engineer: McClure Engineering Associates, Inc.
716 E. Jackson, P. 0. Box 593
Attest: Macomb, IL 61455 '~~
Se 'or
Title: Administrative Secretary Title: Vice President
r..~
", ~ McCLURE
~ ENGINEERING
i ASSOCIATES, INC.
November 24, 1993
Mayor Donald Edwards
City of Canton
210 E. Chestnut St.
Canton, IL 61520
Attn: Tracie Skaggs
Re: Chestnut Street Construction Observation
CAN-22-06-92-146
Dear Mayor Edwards:
As I have previously discussed with Ms. Skaggs, we anticipate that
the Not To Exceed contract amount as shown in our contract with the
City of Canton will be exceeded. The original amount of the
contract is 645,000. We propose to extend the contract Not To
Exceed amount to 650,000.
The main factor which affected our original budget was due to the
need of a MEAI technician for full time construction observation
for several weeks this past summer. Ms. Skaggs had requested this
due to the need for her full time attention on other matters.
Please find enclosed four copies of the Addendum ~2 to Construction
Engineering Services Agreement for Motor Fuel Tax Funds for your
execution. The addendum will require IDOT concurrence.
Should you have any questions, please do not hesitate to call this
office.
Sincerely,
McCLURE ENGINEERING ASSOCIATES, INC.
Eric C. Moe, P.E.
Project Engineer
ECM/lt