Loading...
HomeMy WebLinkAboutResolution #153 Oa a r r — t>zys RESOLUTION WHEREAS, the spillway of the Lake Cantos Dam is in urgent need of repairs and it is deemed expedient that immediate steps be taken to make extensive repairs to the same in order to safeguard the City against the possibility of failure of said dam and the loss of the Canton Water Supply. Now therefore; BE IT RESOLVED by IZACMy Co i1 of Canton, Illinois, in regular session assembled this ' ay of , 1548, that the Mayor. with the advice and upon the approval of the Water Committee, be authorized and enpowered to employ a firm of Consulting Engineers to make a survey and investigation of the condition of said Lake Canton spillway and submit to the Mayor and Water Committee a report outlining the most feasible and economical manner by which said spillway can be repaired, together with a prbliminary estimate of cost of such repairs, and BE IT FURTHER RESOLVED, that, upon approval of said report by the Mayor and Water Committee, the Mayor of Canton be directed to authorize the Consulting Engineers who make the preliminary investigation and report to draw up final plans, specifications and cost estimates and after a construction contract is let. furnish consulting engineering supervision during construction in order to insure the City against poor workmanship, use of improper materials and misinterpretation of the plans and speci- fications, • / rMayor .__. A . • . A. ._.- i % Clerk