Loading...
HomeMy WebLinkAbout#5117 IDOT Maintenance Illinois Department Resolution for Maintenance o a of Transportation Under the Illinois Highway Code Resolution Number Resolution Type Section Number • J// 7 Original 17-00000-00-GM BE IT RESOLVED, by the Council of the City of Governing Body Type Local Public Agency Type Canton Illinois that there is hereby appropriated the sum of three hundred Name of Local Public Agency thousand Dollars ($300,000.00 of Motor Fuel Tax funds for the purpose of maintaining streets and highways under the applicable provisions of Illinois Highway Code from 01/01/17 to 12/31/17 . Beginning Date Ending Date BE IT FURTHER RESOLVED,that only those operations as listed and described on the approved Estimate of Maintenance Costs, including supplemental or revised estimates approved in connection with this resolution,are eligible for maintenance with Motor Fuel Tax funds during the period as specified above. BE IT FURTHER RESOLVED,that City of Canton Local Public Agency Type Name of Local Public Agency shall submit within three months after the end of the maintenance period as stated above,to the Department of Transportation, on forms available from the Department,a certified statement showing expenditures and the balances remaining in the funds authorized for expenditure by the Department under this appropriation,and BE IT FURTHER RESOLVED,that the Clerk is hereby directed to transmit four(4)ceritified originals of this resolution to the district office of the Department of Transportation. I Diana Pavley-Rock City Clerk in and for said City Name of Clerk Local Public Agency Type Local Public Agency Type of Canton in the State of Illinois,and keeper of the records and files thereof, as Name of Local Public Agency provided by statute, do hereby certify the foregoing to be a true, perfect and complete copy of a resolution adopted by the Council of Canton at a meeting held on _ 08/01/17 Governing Body Type Name of Local Public Agency Date IN TESTIMONY WHEREOF, I have hereunto set my hand and seal this 1st day of August, 2017 Day Month,Year (SEAL) Clerk Sit re APPROVED Regional Engineer Department of Transportation Date Printed 07/27/17 BLR 14220(Rev_03/13/17) Hinds Department Municipal Estimate of tv of Transportation Maintenance Costs Submittal Type Original Maintenance Period Local Public Agency County Section Beginning Ending City of Canton Fulton 17-00000-00-GM 01/01/17 12/31/17 Estimated Cost of Maintenance Operations Maint. For Group I, IIA, IIB or III Maintenance Operation Eng. Insp. Unit Item Est Total (No. and Description) Group Req. Item Unit Quantity Price Cost Operation Cost Contract Maintenance 1. Mill and HMA Overlay V Y HMA Surf Rem, 1-1/2" S.Y. 353 $4.00 $1,412.00 ( 10,980 SY) V Y HMA Surf Rem, 2" S.Y. 10,627 $4.00 $42,508.00 ✓ Y Temporary Ramp S.Y. 60 $20.00 $1,200.00 ✓ Y Bit Matls (Tack Coat) Lb 4,941 $2.00 $9,882.00 ✓ Y HMA Surf Cse D N50 Ton 1,224 $100.00 $122,400.00 ✓ Y Pavement Markings Foot 550 $3.00 $1,650.00 ✓ Y RR Liability Ins L Sum 1 $5,000.00 $5,000.00 $184,052.00 2. Seal Coat(A-1) II Y Bit Matls Seal CRSP Gal 6,380 $6.00 $38,280.00 ( 15,950 SY) II V Seal Coat Agg(Blk Trp) Ton 200 $100.00 $20,000.00 $58,280.00 3. Spray Patch IA Y Spray Patch L Sum 1 $19,999.00 $19,999.00 $19,999.00 Preliminary Engineering Base Fee 1 $1,250.00 $1,250.00 IIA $19,999 @ 2% 0.02 $19,999.00 $399.98 Ill $58,280 @ 4% 0.04 $58,280.00 $2,331.20 IV $184,052 @ 5% 0.05 $184,052.0 $9,202.60 Engineering Inspection IIA $19,999 @ 1% 0.01 $19,999.00 $199.99 Ill $58,280 @ 4% 0.04 $58,280.00 $2,331.20 IV $184,052@6% 0.06 $184,052.0 $11,043.12 Add Row Total Estimated Maintenance Operation Cost $262,331.00 Estimated Cost of Maintenance Engineering Maintenance Program Estimated Costs Preliminary Engineering $13,183.78 Estimated Cost MFT Portion Other Funds Engineering Inspection $13,574.31 Maint Oper $262,331.00 $262,331.00 Material Testing Maint Eng $26,758.09 $26,758.09 Advertising Totals $289,089.09 $289,089.09 Bridge Inspections Total Estimated Maintenance Cost $289,089.09 Total Estimated Maintenance $26,758.09 Engineering Cost Submitted Munici al Official Date Approved 11 (l.� O nn r//„ /r�r Regional Engineer IVA'A` 3-0, 6 r—� / Department of Transportation Date Title Mayor Printed 07/27/17 Page 1 of 1 BLR 14231 (Rev.04/11/17) G Illinois Department Maintenance Engineering to be of Transportation Performed by a Consulting Engineer (to be attached to BLR 14231 or BLR 14221) Local Agency City of Canton Section Number 17-00000-00-GM The services to be performed by the consulting engineer, pertaining to the various items of work included in the estimated cost of maintenance operations (BLR 14231 or BLR 14221), shall consist of the following: PRELIMINARY ENGINEERING shall include: Investigation of the condition of the streets or highways for determination (in consultation with the local highway authority) of the maintenance operations to be included in the maintenance program: preparation of the maintenance resolution, maintenance estimate of cost and, if applicable, proposal; attendance at meetings of the governing body as may reasonably be required; attendance at public letting: preparation of the contract and/or acceptance of BLR 12330 form. The maintenance expenditure statement must be submitted to IDOT within 3 months of the end of the maintenance period. ENGINEERING INSPECTION shall include: Furnishing the engineering field inspection, including preparation of payment estimate for contract, material proposal and/or deliver and install proposal and/or checking material invoices of those maintenance operations requiring engineering field inspection, as opposed to those routine maintenance operations as described in Chapter 14-2.04 of BLRS Manual, which may or may not require engineering inspection. For furnishing preliminary engineering, the engineer will be paid a base fee PLUS a negotiated fee percentage. For furnishing engineering inspection the engineer will be paid a negotiated fee percentage. The negotiated preliminary engineering fee percentage for each group shown in the"Schedule of Fees"shall be applied to the total estimated costs of that group. The negotiated fee for engineering inspection for each group shall be applied to the total final cost of that group for the items which required engineering inspection. In no case shall this be construed to include supervision of contractor operations. SCHEDULE OF FEES Total of the Maintenance Operation Base Fee ® > $20,000 $1,250.00 ❑ S$20,000(Negotiated: $1,250 Max.) PLUS Group Preliminary,Engineering Engineerrin• Inspection Ooeration to be Acceptable Fee% Negotiated Fee % Acceptable Fee % Negotiated Fee % Inspected NA NA NA NA NA IIA 7% 7% 1% 1% IIB 3% 3% •III 4% 4% 4% 4% ,••GEAI,41"q IV 5% 5% 6% 6% 43",•••" tqf.,,� o.A� /1 . 062-0429171 S. By: I , • BY -AZ LICENSED Local Agency Office Signature Cons king Engineer Signature PROFESSIONAL: _ ENGINEER Mayor Senior Project Enginer OF Title Title /��/�Bal•x .,,nn„,,,,,non• 6/1/2017 7/27/2017 /1-30-2(7)'7 Date Date P License Expiration Date Printed 7/27/2017 BLR 05520(Rev. 12/06111) RETURN WITH BID QIEnois Department Local Public Agency of Transportation Formal Contract Proposal PROPOSAL SUBMITTED BY Contractor's Name Street P.O.Box City State Zip Code STATE OF ILLINOIS COUNTY OF Fulton City of Canton (Name of City,Village,Town or Road District) FOR THE IMPROVEMENT OF STREET NAME OR ROUTE NO. Various SECTION NO. 17-00000-01-GM TYPES OF FUNDS MFT 0 SPECIFICATIONS(required) ® PLANS(required) For Municipal Projects Department of Transportation (/ $uhlep)Fjoved/ e ® Released for bid based on limited review ® nt Mayor 0 Presideof Boa (Trustees 0 Municipal Official Regional Engineer Date August 1, 2017 Date For County and Road District Projects Submitted/Approved Highway Commissioner Date Submitted/Approved County Engineer/Superintendent of Highways Date Note: All proposal documents,including Proposal Guaranty Checks or Proposal Bid Bonds,should be stapled together to prevent loss when bids arc processed. Printed 7/27/2017 Page 1 of6 BLR 12200(01/08/14) RETURN WITH BID Illinois Departrnelrtl Local Public Agency of Tia ortafion Material Proposal or o � Deliver 8 Install Proposal PROPOSAL SUBMITTED BY Contractor's Name Street P.O.Box City State Zip Code STATE OF ILLINOIS COUNTY OF Fulton City of Canton (Name of City,Village,Town or Road District) FOR THE IMPROVEMENT OF STREET NAME OR ROUTE NO. Various SECTION NO. 17-00000-02-GM TYPES OF FUNDS MFT 0 MATERIAL PROPOSAL ®DELIVER B INSTALL PROPOSAL ®SPECIFICATIONS(required) D PLANS(if applicable) For Municipal Projects Department of Transportation SkmAr,/�t � prove ® Released for bid based on limited review ® ayor ❑President of Boa of Trustees Municipal Official Regional Engineer Date August 1, 2017 Date For County and Road District Projects Submitted/Approved Highway Commissioner Date Submitted/Approved County Engineer/Superintendent of Highways Date Note: All proposal documents,including Proposal Guaranty Checks or Proposal Bid Bonds,should be stapled together to prevent loss when bids are processed. Printed 7/27/2017 Page 1 of 2 BLR 12240(Rev.01/09/14) GEndstMunicipal Estimate of °,�°' of Transportation Maintenance Coats ° ' Submittal Type Original Maintenance Period Local Public Agency County Section Beginning Ending City of Canton Fulton 17-00000-00-GM 01/01/17 12/31/17 Estimated Cost of Maintenance Operations Maint. For Grou I, (IA, IIB or III Maintenance Operation Eng. Insp. Unit Item Est Total (No.and Description) Group Req. Item Unit Quantity Price Cost Operation Cost Contract Maintenance 1. Mill and HMA Overlay V Y lHMA Surf Rem, 1-1/2" S.Y. 353 $4.00 $1,412.00 (20,096 SY) V Y HMA Surf Rem, 2" S.Y. 12,400 $3.50 $43,400.00 ✓ V Temporary Ramp S.Y. 60 $20.00 $1,200.00 ✓ Y Bit Matls(Tack Coat) Lb 5,739 $2.00 $11,478.00 ✓ Y HMA Surf Cse D N50 Ton 1,423 $95.00 $135,185.00 ✓ Y Pavement Markings Foot 550 $3.00 $1,650.00 ✓ V RR Prot Liability Ins L Sum 1 $5,000.00 $5,000.00 $199,325.00 2. Seal Coat(A-1) II Y Bit Matls Seal CRSP Gal 7,178 $4.50 $32,301.00 (15,950 SY) II Y Seal Coat Agg(Blk Trp) Ton 200 $100.00 $20,000.00 $52,301.00 3. Spray Patch IA Y CRS-2 Oil Gal 2,700 $6.55 $17,685.00 IA Y CA 16 Aggregate Ton 72 $32.00 $2,304.00 $19,989.00 Add Row Total Estimated Maintenance Operation Cost $271,615.00 Estimated Cost of Maintenance Engineering Maintenance Program Estimated Costs Preliminary Engineering $13,708.07 Estimated Cost MFT Portion Other Funds Engineering Inspection $14,251.43 Maint Oper $271,615.00 $271,615.00 Material Testing, Maint Eng $27,959.50 $27,959.50 AdvertisinTotals $299,574.50 $299,574.50 Bridge Inspections Total Estimated Maintenance Cost $299,574.50 Total Estimated Maintenance $27,959.60 Engineering Cost Submitted Munid I Offidal Date Approved t�r�A /,1�1. 1 �^�}tnl /, Regional Engineer V �W� ♦ ��Wr'� Department of Transportation Date Tit Mayor Printed 06/16/17 Page 1 of 1 BLR 14231(Rev.04/11/17) CD 0! E !* ! ! (/ ( |! z a / } o op t \ $ 'C 0 0 = - ' lI }2 _ _ __ = 2 § * ) 0 }\\ a as _ ; ;/ \ ; 9 afl CO 01 1)3 - $ Dr } ) { ® ` !k xi ` 171 > z Com 0 co ` � | � 2 \} m k •0 DJ g Ca i 0 111. LT 3 - - \\ \ 0-s 2 | [ b ! ;( ) 41 --.I E ;; q 8 - \ ![ -_ % UI13 $§ w ■ ! 06 r | J * 1 al ra } / « E 1 \ � £{ ! W _ k \ ${ ( Cl m \ ; ! !! ! , CC 0) ° ! 0 ! : ! � ( $ i ( a ` ' O. --Ig a £ / % A ; � ! | | r | ( *k] E | a f ; ! , ! - l : 22 I ~ - ■ o ( | \ | } ce \ N. CO -VI - ! #/ ( E ,0 co ! ! * t co » _! - - _ ` !` 3 I\/9} i \ - - ƒ! \ \� � / i0 le.i0� § \ ( cn ca ca, Q / ar so i &( / ! 35 \ \� 5 43 ` 1p \ � � \\\ \ \ \ \ CD 0 0 Illinois Department of Transportation Office of Highways Project Implementation I Region 3l District 4 401 Main Street I Peoria,Illinois 61602-1111 August 18, 2017 City Motor Fuel Tax (MFT) City of Canton Section 17-00000-00-GM 2017 General Maintenance Ms. Diana Pavley-Rock City Clerk 2 North Main Street Canton, Illinois 61520 Dear Ms. Pavley-Rock: The resolution adopted by the City Council on August 1, 2017 appropriating $300,000.00 of Motor Fuel Tax funds for the maintenance of streets and highways in the City of Canton from January 1, 2017 to December 31, 2017 was approved on August 17, 2017. The Municipal Estimate of Maintenance Costs for$299,574.50, the Maintenance Engineering statement, the Deliver and Install Proposal, and the Contract Proposal were approved on August 17, 2017. This maintenance program is approved with the understanding that any claims for labor and equipment for day labor and routine maintenance will be on file and available for compliance review by Local Roads and Streets and for audit by the Bureau of Investigations and Compliance. Authorization to expend $19,989.00 of Motor Fuel Tax funds for maintenance and $27,959.50 for maintenance engineering for this section have been approved and should appear on the city's next Motor Fuel Tax transaction detail. Authorization to expend additional Motor Fuel Tax funds will be given upon approval of an Acceptance of Proposal to Furnish Materials and Approval of Award(BLR 12330) and a formal contract (BLR 12320) for this section. Bids are required for purchases of materials if the expenditures exceed $20,000 during any maintenance period either(1) for the same type of materials, or(2)from any one vendor if the purchase includes the placement or incorporation of the materials. For Group IV items, the Contractor's Certificate of Eligibility must be submitted with the fully executed contract when prequalification was a bidding requirement. Ms. Diana Pavley-Rock Page Two August 18, 2017 Please be advised that ALL projects involving pavement alterations and/or replacement/repair of sidewalks shall have curb ramps that comply with the current Americans with Disabilities Act (ADA) Guidelines. One copy of the approved maintenance papers has been forwarded to Maurer- Stutz, Inc. If you have any questions, please contact Simon Alwan at (309) 671-3694. Sincerely, Kensil A. Garnett, P.E. Region Three Engineer SJA/Imh slgenlbIrslstafPatwan\transmittal letters\gm\municipal maintenancekitymainteofc.canton.17-gm.tlocx Enclosures cc: Maurer-Stutz, Inc. (Mr. George Merkle) District Four Compliance Review Officer File Q111015 IlPfit Resolution for Maintenance o 0 O} 811011 Under the Illinois Highway Code o Resolution Number Resolution Type Section Number 5) 7 Original 17-00000-00-GM BE IT RESOLVED, by the Council of the City of Governing Body Type Local Public Agency Type Canton Illinois that there is hereby appropriated the sum of three hundred Name of Local Public Agency thousand Dollars ($300,000.00 ) of Motor Fuel Tax funds for the purpose of maintaining streets and highways under the applicable provisions of Illinois Highway Code from 01/01/17 to 12/31/17 Beginning Date Ending Date BE IT FURTHER RESOLVED,that only those operations as listed and described on the approved Estimate of Maintenance Costs, including supplemental or revised estimates approved in connection with this resolution,are eligible for maintenance with Motor Fuel Tax funds during the period as specified above. BE IT FURTHER RESOLVED,that City of Canton Local Public Agency Type Name of Local Public Agency shall submit within three months after the end of the maintenance period as stated above,to the Department of Transportation,on forms available from the Department,a certified statement showing expenditures and the balances remaining in the funds authorized for expenditure by the Department under this appropriation,and BE IT FURTHER RESOLVED,that the Clerk is hereby directed to transmit four(4)ceritified originals of this resolution to the district office of the Department of Transportation. I Diana Pavley-Rock City Clerk in and for said City Name of Clerk Local Public Agency Type Local Public Agency Type of Canton in the State of Illinois, and keeper of the records and files thereof, as Name of Local Public Agency provided by statute, do hereby certify the foregoing to be a true,perfect and complete copy of a resolution adopted by the Council of Canton at a meeting held on 08/01/17 Governing Body Type Name of Local Public Agency Date IN TESTIMONY WHEREOF, I have hereunto set my hand and seal this 1st day of August, 2017 Day Month,Year (SEAL) Clerk ' na re / ' RECoRoEo APPROVED Re ional Engineer g I- I. partment of Transportation Date pat:e: s � gy _Bi...� cz3L�d._..., 013119 I, Printed 07/27/17 BLR 14220(Rev.03113/17) • QIlnqis Department Municipal Estimate of o9.0 of Transportation Maintenance Costs o5°� Submittal Type Original Agency Maintenance Period Local Public A 9 cy County Section Beginning Ending City of Canton Fulton 17-00000-00-GM 01/01/17 12/31/17 Estimated Cost of Maintenance Operations Maint. For Group I, IIA, IIB or III Maintenance Operation Eng. Insp. Unit Item al (No. and Description) Group Req. Item Unit QuantityPrice Cost Esta iont Contract Maintenance Operation Cost 1. Mill and HMA Overlay V V HMA Surf Rem, 1-1/2" S.Y. 353 $4.00 $1,412.00 (20,096 SY) V V HMA Surf Rem, 2" S.Y. 12,400 $3.50 $43,400.00 ✓ Y Temporary Ramp S.Y. 60 $20.00 $1,200.00 ✓ V Bit Matls(Tack Coat) Lb 5,739 $2.00 $11,478.00 ✓ Y HMA Surf Cse D N50 Ton 1,423 $95.00 $135,185.00 ✓ Y Pavement Markings Foot 550 $3.00 $1,650.00 ✓ Y RR Prot Liability Ins L Sum 1 $5,000.00 $5,000.00 $199,325.00 2. Seal Coat(A-1) II Y Bit Matls Seal CRSP Gal 7,178 $4.50 $32,301.00 (15,950 SY) II Y Seal Coat Agg(Blk Trp) Ton 200 $100.00 $20,000.00 $52,301.00 3. Spray Patch IA Y CRS-2 Oil Gal 2,700 $6.55 $17,685.00 IA V CA 16 Aggregate Ton 72 $32.00 $2,304.00 $19,989.00 Add Row I Total Estimated Maintenance Operation Cost $271,615.00 Estimated Cost of Maintenance Engineering Maintenance Propmm Estimated Costs Preliminary Engineering $13,708.07 Estimated Cost MFT Portion Other Funds Engineering Inspection $14,251.43 Maint Oper $271,615.00 $271,615.00 Material Testing Maint Eng $27,959.50 $27,959.50 Advertising Totals $299,574.50 $299,574.50 Bridge Inspections Total Estimated Maintenance Cost $299,674.50 Total Estimated Maintenance $27,969.60 Engineering Cost Submitted Munich•-I Official Date LV Approved / Regional Engineer �V Department of Transportation Date Till -47- Mayor a --Sc-v. 015/017 Printed 08/16/17 Page 1 of 1 BLR 14231(Rev.04/11117) • 0 Illinois Department Maintenance Engineering to be of lan Performed by a Consulting Engineer (to be attached to BLR 14231 or BLR 14221) Local Agency City of Canton Section Number 17-00000-00-GM The services to be performed by the consulting engineer, pertaining to the various items of work included in the estimated cost of maintenance operations(BLR 14231 or BLR 14221), shall consist of the following: PRELIMINARY ENGINEERING shall include: Investigation of the condition of the streets or highways for determination (in consultation with the local highway authority) of the maintenance operations to be included in the maintenance program: preparation of the maintenance resolution, maintenance estimate of cost and, if applicable, proposal; attendance at meetings of the governing body as may reasonably be required; attendance at public letting; preparation of the contract and/or acceptance of BLR 12330 form. The maintenance expenditure statement must be submitted to IDOT within 3 months of the end of the maintenance period. ENGINEERING INSPECTION shall include: Furnishing the engineering field inspection, including preparation of payment estimate for contract, material proposal and/or deliver and install proposal and/or checking material invoices of those maintenance operations requiring engineering field inspection, as opposed to those routine maintenance operations as described in Chapter 14-2.04 of BLRS Manual, which may or may not require engineering inspection. For furnishing preliminary engineering, the engineer will be paid a base fee PLUS a negotiated fee percentage. For furnishing engineering inspection the engineer will be paid a negotiated fee percentage. The negotiated preliminary engineering fee percentage for each group shown in the"Schedule of Fees" shall be applied to the total estimated costs of that group. The negotiated fee for engineering inspection for each group shall be applied to the total final cost of that group for the items which required engineering inspection. In no case shall this be construed to include supervision of contractor operations. SCHEDULE OF FEES Total of the Maintenance Operation Base Fee N >$20,000 $1,250.00 0 s$20,000(Negotiated: $1,250 Max.) PLUS Group Prelimina Engineering Engineering Inspection Operation to be Acceptable Fee% Negotiated Fee % Acceptable Fee% Negotiated Fee% Inspected I NA NA NA NA NA IIA 7% 7% 1% 1% IIB 3% 3% III 4% 4% 4% 4% %%%%%„ IV 5% - r� . 062-042917 5r By: ki- By. Pel 8 /1LICENSED Local Age is gna ure / Consulting Engineer Signiturd PROFESSIONAL i ENGINEER Mayor Senior Project Enginer YOF Title Title ..."5411:A OF n, 8/1/20177/27/2017 /l-30-/fr30-2 26/7 Date Date P.E. License Expiration Date Printed 7/272017 BLR 05520(Rev. 12/06/11) �i-e 9UL,t1IA� 5117 0 Illinois Department of Transportation Office of Highways Project Implementation I Region 3/District 4 401 Main Street/Peoria, Illinois 61602-1111 November 13, 2017 Municipal Motor Fuel Tax(MFT) City of Canton Section 17-00000-00-GM Ms. Diana Pavely-Rock, City Clerk 2 North Main Street Canton, Illinois 61520 Dear Ms. Pavely-Rock: The revised Municipal Estimate of Maintenance Costs for$302,733.56 was approved on November 8, 2017. This maintenance program is approved with the understanding that any claims for labor and equipment for day labor and routine maintenance will be on file and available for compliance review by Local Roads and Streets and for audit by the Bureau of Investigations and Compliance. Authorization to expend $ 313.06 of Motor Fuel Tax funds for maintenance engineering for this section has been approved and should appear on the city's next Motor Fuel Tax transaction detail. Bids are required for purchase of materials if the expenditures exceed $20,000 during any maintenance period either(1)for the same type of materials, or(2) from any one vendor if the purchase includes the placement or incorporation of the materials. Please be advised the ALL projects involving pavement alterations and/or replacement/repair of sidewalks shall have curb ramps that comply with the current Americans with Disabilities Act (ADA) Guidelines. Canton/ Diana Pavely-Rock, City Clerk Page Two November 13, 2017 For Group IV items, the Contractor's Certificate of Eligibility must be submitted with the fully executed contract when prequalification was a bidding requirement. One copy of the approved maintenance papers has been forwarded to Maurer- Stutz. If you have any questions, please contact Simon Alwan at (309) 671-3694. Sincerely, Kensil A. Garnett, P.E. Region Three Engineer SJA/bkf s:\gen\vidinwoN\blrs\stafnalwan\letters\city-letters-estmaintcasts\wnton_17-00000-00-gm.docx Enclosures cc: Maurer-Stutz Documentation Review File • QMunicipal Estimate of °+ awls Department of Tansportalion Maintenance Costs Submittal Type Revised Maintenance Period Local Public Agency County Section Beginning Ending City of Canton Fulton 17-00000-00-GM 01/01/17 12/31/17 Estimated Cost of Maintenance Operations Maint. For Group I, IIA, IIB or III Maintenance Operation Eng. Insp. Unit Item Est Total (No. and Description) Group Req. Item Unit Quantity Price Cost Operation Cost Contract Maintenance 1. Mill and HMA Overlay V Y HMA Surf Rem, 1-1/2" S.Y. 353 $4.00 $1,412.00 (20,096 SY) V V HMA Surf Rem,2" S.Y. 12400 $3.50 $43,400.00 ✓ Y Temporary Ramp S.Y. 60 $20.00 $1200.00 ✓ Y Bit Matls(Tack Coat) Lb 5,739 $2.00 $11,478.00 ✓ Y HMA Surf Cse D N50 Ton 1,423 $95.00 $135,185.00 ✓ V Pavement Markings Foot 550 $3.00 $1,650.00 ✓ Y RR Prot Liability Ins L Sum 1 $5,000.00 $5,000.00 ✓ Y Matl Transfer Device Ton 1,423 $2.00 $2,846.00 $202,171.00 2. Seal Coat(A-1) II Y Bit Matls Seal CRSP Gal 7,178 $4.50 $32,301.00 (15,950 SY) II Y Seal Coat Agg(Blk Trp) Ton 200 $100.00 $20,000.00 $52,301.00 3. Spray Patch IA V CRS-2 Oil Gal 2,700 $6.55 $17,685.00 IA V CA 16 Aggregate Ton 72 $32.00 $2,304.00 $19,989.00 Add Row I Total Estimated Maintenance Operation Cost $274,461.00 Estimated Cost of Maintenance Engineering Maintenance Program Estimated Costs Preliminary Engineering $13,850.37 Estimated Cost MFT Portion Other Funds Engineering Inspection $14,422.19 Maint Oper $274,461.00 $271,615.00 Material Testing Maint Eng $28,272.56 $27,959.50 Advertising Totals $302,733.56 $299,574.50 Bridge Inspections Total Estimated Maintenance Cost $302,733.56 Total Estimated Maintenance $26,272.66 Engine.nng Cost Submitted Municipal OffidalDate I/ , ./ \ � /D/ Approved� Regional Engineer fa/I ffll Department of Transportation Date Title VI/,�� =A VA �+•. 3�v.,� a -'J. rn I 11117 Panted 10/25/17 Page 1 of 1 BLR 14231(Rev.04/11/17) INiofnoisnspoDepartment Trartation TRANSMITTAL LETTER Office of Highways Project Implementation/Region 3/District 4•401 Main Street•Peoria, Illinois 61602-1111 •Telephone 309/671-3333 Date: March 13, 2018 To: City of Canton Route: 2 North Main Street Section: 17-00000-00-GM Canton, Illinois 61520 County: Fulton Job No.: Contract No.: Attention: Ms. Diana Pavley-Rock, City Clerk Agency: City of Canton Subject: Approved Municipal Maintenance Expenditure Statement(BLR 14310) Transmittal Sent As Marked Below: ❑ For Processing/Approval 0 Other(See Remarks) 0 Returned for Corrective Action ❑ For Your Information/Response ❑ Per Our Conversation 0 Review and Comments O Note and File 0 Per Your Request ❑ Take Appropriate Action Description and/or Remarks: Attached is the approved Municipal Maintenance Expenditure Statement(BLR 14310)for the above mentioned section. If you have any questions, please contact Mr. Simon Alwan at(309)671-3694. •i ! q Kensil A. Garnett, P.E. Region Three Engineer SJA/bkf s:\gen\winword\blrs\staff\alwan\transmittal Tetters nunicipaI\maint exp statement\canton_17-00000-00-gm.docm Attachment(s) cc: Maurer-Stutz, Inc. Documentation Review File Printed 3/13/2018 D4 AD0101 (Rev.07/06/16) Illinois Department of Transportation TRANSMITTAL LETTER Office of Highways Project Implementation/Region 3/District 4.401 Main Street•Peoria, Illinois 61602-1111 •Telephone 309/671-3333 Date: March 13, 2018 To: City of Canton Route: 2 North Main Street Section: 17-00000-00-GM Canton, Illinois 61520 County: Fulton Job No.: Contract No.: Attention: Ms. Diana Pavley-Rick, City Clerk Agency: City of Canton Approved Request for Approval of Change in Plans(BLR 13210)and Engineer's Final Pay Estimates Subject: (BLR 13231) Transmittal Sent As Marked Below: o For Processing/Approval 0 Other(See Remarks) ❑ Returned for Corrective Action ❑ For Your Information/Response 0 Per Our Conversation 0 Review and Comments O Note and File 0 Per Your Request 0 Take Appropriate Action Description and/or Remarks: Attached is the approved Request far Approval of Change in Plans(BLR 13210) and the Engineer's Final Payment Estimates (BLR 13231)for sections 17-00000-01-GM and 17-00000-02-GM. If you have any questions, please contact Mr. Simon Alwan at(309)671-3694. Kensil A. arnett, P.E. - g Region Three Engineer SJA/bkf Attachment(s) cc: Maurer-Stutz Documentation Review File s\gen\wtnword\blrs\staH\alwan\transmittal letters\municipal\changeplan8engfnalpayest\canton-17-00000-00-gm.docm Printed 3/13/2018 04 AD0101 (Rev.07/08/18) / % - # : /. !� R. RE I ~ lc _ H C8 : irl o a ll � ; - w LO c00.1 N., • ; ! ! \ , ! \\` : ° ƒ RI " cc \ 13 j , _ m r o \ \ [ § 00 \ it On Co no 2 - \ } \ _ CII.\CO \ j - , ! ; § ` v0 } 01 a - I - ® / 7 - 2 3 o } k $ o ! co ! 2 ! :4j . !) Jk \ 0 - 0 = ; ! ! . , f \ \ ) k ; ! ^ c ID c ; ® ! _ _ � § _ _ .8 L0 IL IL 0 } � /{ /\ C $ ; 000B0 _ § -, _ � 0 Fr � | ! 2 )/ coan | : a -J`J /H Q! : � / ! \ N- ]/ Co 0 CO ; i | ! \! e % \ \}J \ \ 82 c% ; U » ! ^ G II ! \ \ \ - c O. 0 /� k br} zkl , $ / - ®®®11r b ! liii 5 ` ! : « ! k 0 Lu/ k ! )} 7 03 \LO < � ! ! ! ! %jE ! & I !! ! /! ! ! ! ! ) & q. Cl CO . .t 4 QHinds Department Request for Approval of Transportation of Change in Plans Date: 2/5/2018 County: Fulton Request No 1p Final Road District or Municipality: City of Canton Contractor: Advanced Asphalt Company Section No. 17-00000-01-GM Address: P.O.Box 234 Princeton,IL 61356 I recommend that this deduction be made from the above contract. (addition,extension,eeeumon) 0o,from) The estimated quantities are shown below and the contractor agrees to furnish the materials and do the work at the unit prices. Item Description Unit Quantity Unit Price naareon(n)w Total Addition Total Deduction Deautlron(p) HMA Surface Removal 2" Sq Yd 932.00 3.65 D $ - $ 3,401.80 HMA Surface Removal 1-1/2" Sq Yd 63.00 6.50 A $ 409.50 $ - Driveway Butt Jt Each 2.00 400.00 A $ 800.00 $ - Bit Matls(Tack Ct) Lb 1406.00 0.75 0 $ - $ 1,054.50 Temporary Ramp Sq Yd 47.00 20.00 D $ - $ 940.00 HMA Surf Cse Mix D N50 Ton 85.50 89.50 D $ - $ 7,652.25 Material Transfer Device Ton 98.50 3.00 D $ - $ 295.50 Thermo Pvt Mk Line P' Foot 100.00 8.43 A $ 843.00 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Total Changes: $ 2,052.50 $ 13,344.05 BLR 13210 (Rev. 11/07/13) Printed 2/9/2018 1 of 2 Total Net Change: $ (11,29155) Amount of Original Contract: $ 194.922.75 Amount of Previous Change Orders: Amount of adjustedmnal contract: $ 183,631.20 Total net deduction to date $ (11,291.55) which is -5.79 %of the contract price. (addition,deduction) State fully the nature and reason for the change: Final field measurements When the net increase or decrease in the cost of the contract is$1q000.00 or more,or the time of completion is increased or decreased by 30 days or more,one of the following statements must be checked: I The undersigned has determined that the circumstances which necessitate this change were not reasonably foreseeable at the time the contract was signed. %❑ The undersigned has determined that the change is germane to the original contract as signed. ElThe undersigned has determined that this change is in the best interest of the Local Agency and is authorized by law. Prepared by: Gerge B.Merkle Senior Project Engineer-Maurer-Stutz,Inc. Title of Preparer For County and Road District Projects For Municipal Projects ccts t n Highway Commissioner f ✓ nVMunal Officer Date itai TtlJunicis !�/ Submitted/Approved Date County Engineer/superintendent of Highways Approved /� �tlI /'� �/[[ ' Dale ! 1 A-. 64-44. '11-pR1._ ,,,♦♦♦ Regional Engineer 7-c -f' Date Note: Make out separate form for change in length quantities. Give net quantities Submit 8 Originals II plans are required attached 3 sets. BLR 13210 (Rev.11/07/13) Printed 2/9/201 B 2 of 2 - 4. . Route Various o Minds Department County Fulton of Transportation Local Agency City of Canton Section 17-00000-01 -GM Engineer's Final Payment Estimate Estimate No. 1 and Final Date of Completion 10-23-2017 Payable To: Name Advanced Asphalt Company Address P.O.Box 234;Princeton, IL 61356 Items Awarded* Added Deducted Completed _ _Quantify _ Values Quant' Quantity - Quantity I Unit Price Value- Totals from previous page HMA Surface Removal 2' 12,400.00 45,260.00 932.00 1146800 365 41,858.20 HMA Surface Removal 1-1/7• 353.00 2,294.50 63.00 416.00 6.50 2304.00 Bit Malls(Tack Cl) 1739.00 4104.25 1406.00 4333.00 0.75 1249.75 Temporary Ramp 60.00 1300.00 47.00 13.00 20.00 260.00 HMA Sud Cse,Mix 0,N50 1423.00 127,358.50 85.50 1 337.50 89.50 119,706.25 Matelot Transfer Device 1,423.00 4,269.00 98.50 - 1324.50 3.00 1973.50 Thermo Pvt Merkin Line 4" 550.00 4,636.50 100.00 650.00 13.43 5,479.50 Railroad Liability Insurance 1.00 ,. 5600.00 1.00 5,600.00 5600.00 Total Awarded Values $194,922.75 Total Completed Values 5182,831.20 Page 1 of 2 BLR 13231 (Rev. 1/06) Printed on 2/9/2018 8:24:14 AM � Section Number: 17-00000-01 -GM Total Brought Forward $182,831.20 Miscellaneous Extras and Credits Values Driveway Butt Joint 800.00 Total Miscellaneous Extras and Credits 800.00 Total Value of Completed Work 183,631.20 Miscellaneous Debits Values Total Miscellaneous Debits Net Cost of Section $183,831.20 Previous Payments p,A,' Net Amount Due $183,631.20 Signed: ! I 12"-- z/B/2D/B lly Resident En ineerlCoonnlsuryygnh Date Signed: Y ,l- -. � /�/�zzad 777«< A Lova Agency �} to Approved: A C-Cwc.LI A. 6-a-L, �u -3— /S— 1 a Regional Engineer Date Page 2 of 2 BLR 13231 (Rev. 1/06) Printed on 2/9/2018 8:24:14 AM t Route Various oIllinois Department County Fulton of Transportation Local Agency City of Canton Section 17-00000 -02-GM Engineer's Final Payment Estimate Estimate No. 1 and Final Date of Completion 10/12/2017 Payable To: Name Laverdiere Construction, Inc. Address 4055 W.Jackson St.; Macomb, IL 61455 Items Awarded* Added Deducted Completed •uantt Va . • 71 •uan it • ._ni Un' • 'c Va - Totals from previous page Bit Matls Seal CRSP 7,178.00 30,506.50 209100 508700 4.25 21,619.75 Seal Coat Aggr(Blk Trap Rock) 200.00 20,000.00 16.84 216.84 100.00 21,684.00 Total Awarded Values $50,506.50 Total Completed Values $43,303.75 Page 1 of 2 BLR 13231 (Rev. 1/06) Printed on 2/9/2018 8:24:45 AM V eA Section Number: 17-00000-02-GM Total Brought Forward $43,303.75 Miscellaneous Extras and Credits Values Total Miscellaneous Extras and Credits Total Value of Completed Work 43,303.75 Miscellaneous Debits Values Total Miscellaneous Debits Net Cost of Section $43,303.75 Previous Payments Net Amount Due $43,303.75 Signed: ( ,G"iW 27412-J/B engtimEg' s C nsu / 6at1y//�Signed: 7/2* e/cy date Approved: �•-Lne.� Ar (�@.,.waib4 pyr 2_ /S-18 Regional Engineer Date Page 2 of 2 BLR 13231 (Rev. 1/06) Printed on 2/9/2018 8:24:45 AM Qlints Department Request for Approval Of Transportation of Change in Plans Date: 2/5/2018 County: Fulton Request No 1 %l Final Road District or Municipality: City of Canton Contractor: Laverdiere Construction, Inc. Section No. 17-00000-02-GM Address: 4055 W.Jackson St. Macomb,IL 61455 I recommend that this deduction be made from the above contract. (addition,extension,deduction) (la,from) The estimated quantities are shown below and the contractor agrees to furnish the materials and do the work at the unit prices. Item Description Unit QuantityUnit Price Addition(A)or Total Addition Total Deduction P oad�maaml Bit Mat'ls Seal CRSP Gal 2091.00 4.25 D $ - $ 8,886.75 $ - $ Seal Coat Aggregate(Bik Trap) Ton 16.84 100.00 A $ 1,684.00 $ - $ - $ $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ $ - $ $ - $ $ - $ - $ - $ - $ - $ $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ Total Changes: $ 1,684.00 $ 8,886.75 BLR 13210 (Rev.11/07/13) Printed 2/9/2018 1 oft Total Net Change' $ (7,202.75) Amount of Original Contract: $ 50,506.50 Amount of Previous Change Orders: Amount of adjusted/final contract: $ 43,303.75 Total net deduction to date $ (7,202.75) which is -14.26 %of the contract price. (addition,deduction) State fully the nature and reason for the change: Final field measurements When the net increase or decrease in the cost of the contract is$10000.00 or more,or the time of completion is increased or decreased by 30 days or more,one of the following statements must be checked: ElThe undersigned has determined that the circumstances which necessitate this change were not reasonably foreseeable at the time the contract was signed. ❑ The undersigned has determined that the change is germane to the original contract as signed. EiThe undersigned has determined that this change is in the best interest of the Local Agency and is authorized by law. Prepared by: Gerge B.Merkle Senior Project Engineer-Maurer-Stutz,Inc. Title of Preparer For County and Road District Projects ���/t��Jd..�� For Municipal Projects ��',j�n but Highway Commissioner / /If/A''/Mymupa�lrcer Date -� / j Jr,Municipal officer Submitted/Approved U �� U Date county Engineer/Superintendent of Highways Approved Date A . C e Regional Engineer 3- /S-I$ Date Note: Make out separate form for change in length quantities. Give net quantities Submit 6 Originals If plans are required attached 3 sets. BLR 13210 (Rev.11/07/13) Printed 2/8/2018 2 of 2